Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0724-01307
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/01/2024 | Site Zoning | APPROVED | |||
08/08/2024 | Water - PDSD | APPROVED | |||
08/05/2024 | Site Engineering | NOT REQUIRED | |||
08/08/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
07/22/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 7/15/2024 7:04:36 PM 1. GENERAL - SPECIAL INSPECTIONS: Per the 2018 International Building Code, Section 1704.2.3, the applicant is responsible for submitting a Statement of Special Inspections as a condition for permit issuance. A full list of required contents of this statement is outlined in IBC Section 1704.3.1. On a case by case basis, the Building Official ("B.O.") may waive the requirement for Special Inspections on small interior renovation projects. If the applicant is requesting that the B.O. waive the requirement, please include a note stating this on the construction documents. 2. GENERAL - SLAB REPAIR: The Architectural Demolition Plan, A002, Plan Note 02 indicates that the existing slab on grade shall be cut to bury conduits for in-slab power. Drawings refer to "Engineering" drawings that do not appear to have been provided. If trenching of the slab is required, please provide a detail to repair the slab to existing conditions. Plan should specify the concrete mix parameters and minimum required reinforcement. If reinforcement is being doweled into existing concrete, please specify an epoxy product and a minimum embedment. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 7/8/2024 1:57:01 PM 1. Sheet A201/Egress Plan: This TI requires the presence of two exits. However, the plan left exit access does not provide the path to the exit and exit discharge. Additionally, no travel distances have been provided. Show the path to the second exit and exit discharge in accordance with 2018 IBC Section 1022 and Section 1028. 2. Sheet A300/Reflected Ceiling Plan: The reflected ceiling plan does not indicate the location of the exit signage. Provide exit signage in accordance with 2018 IBC Section 1013. 3. Sheet A300/Reflected Ceiling Plan: The reflected ceiling plan does not indicate the location of the egress illumination. Provide egress illumination in accordance with 2018 IBC Section 1008. 4. General: Provide a basic site plan that clearly indicate the accessible routes within the site and site arrival points that connect the accessible parking to the accessible entrances that are in accordance with Section 206.2.1 and 206.2.2. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 7/22/2024 4:16:22 PM 1. General - Provide Energy Heat Load Calculations - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads. 2. Plan Sheet M1.1 - VAV-10 SAD (supply air drop) CFM quantity is 1200 CFM. Plan Sheet M1.0 states on the VAV Unit Schedule under Primary Max and Min AF (CFM) 600-150. Confirm CFM quantities for VAV-10 - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC – Section [A]107.2.1Information on construction documents. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 7/21/2024 10:24:13 AM First Plumbing plan review:" 1). Plan page A402 detail D1: Plan page missing the fixture center to sidewall distance at lavatories. Add the required fixture spacing measurements. -2018 IPC 404.2, 405.3.1 2). Plan page A402 detail D1: Plan page missing the fixture center to adjacent fixture center distance at lavatories. Add the required fixture spacing measurements. -2018 IPC 404.2, 405.3.1 |
||
08/02/2024 | Fire New Construction | REVIEW COMPLETED | |||
07/05/2024 | PDSD Application Completeness | REVIEW COMPLETED |