Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0724-01307
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/18/2024 | Air Balancing/Commissioning Report (Deferred Submittal) Express | APPROVED | |||
| 12/18/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/18/2024 | Water Sterilization Report (Deferred Submittal) Express | REQUIRES RESUBMIT | The required water disinfection report is incomplete. Your report should contain the results of a bacteriological examination by a licensed testing laboratory of the water in the distribution system after the chlorine has been purged from the system. Section 610.1 of the 2018 International Plumbing Code describes the testing requirements. | ||
| 12/18/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |