Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.4
Permit Number - TC-COM-0724-01295
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2025 | Other Inspection Reports (Deferred Submittal) Express | NOT REQUIRED | STEEL | ||
| 07/22/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/22/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | The submitted air balance report is rife with errors! The “actual” supply, return, and outside air CFM should be based on the final balance numbers, not the preliminary airflow rates. The “% of Design” values in the terminal unit summary should also be based on the actual flowrates compared to the design flowrates. [Initial comment: Provide an air balancing report to verify that the HVAC systems are capable of supplying and exhausting at least the minimum air flow rates called for in the design drawings. The current submittal is a partial copy of a title sheet. The balancing shall be performed by a qualified balancing contractor in accordance with the procedural standards of either the National Environmental Balancing Bureau (NEBB) or the Associated Air Balance Council (AABC). Reference: Section 403.3.1.5, IMC 2018 as amended by the City of Tucson.] | ||
| 07/21/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 07/22/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REVIEW COMPLETED |