Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0723-01866
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/29/2023 | Design Review | APPROVED | |||
09/01/2023 | Historic | APPROVED | |||
08/03/2023 | Site Engineering | NOT REQUIRED | |||
09/01/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/14/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/14/2023 9:43:50 AM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/14/2023 9:43:07 AM 1) Sheets G1.1, A1.1: Architect's seals are expired. Please seal the plans with an active seal. 2018 IBC section 107 2) Sheet G1.1 (General Notes): Incorrect electrical code shown. The plans need to be designed based on the requirements of the 2017 NEC. 3) Sheet G1.1 (Site Information): Show the correct occupancy group classification per 2018 IBC Chapter 3 and the construction type per 2018 IBC Chapter 6. 4) Sheet G1.1 (Site Information): Include the actual vs the allowed area, number of stories, and height per 2018 IBC sections 503 and 504. Show the calculations for the occupancy load per 2018 IBC section 1004 and Table 1004.5. 5) Sheet A1.1 (Drawings): Show the fire-resistant rated construction for the new or existing horizontal and vertical assemblies for the occupancy separation requirements of Table 508.4. 6) Sheet A1.1 (Drawings): Show the means of egress travel paths, exit signs, means of egress lighting and emergency lights for the new exits. 2018 IBC sections 1003, 1008, 1009, 1010, 1013, 1016. 7) Sheet A1.1 (Drawings): Include the accessibility details for the entrances/exits per the 2009 ICC A117.1. 8) Sheet A1.1 (Drawings): Include the window and door schedules, energy code compliance for the new envelope and conditioned space per the 2018 IECC Section C402. 9) Sheet A1.1 (Drawings): Show the anchoring details of the top and bottom of the new walls to the foundation and beam above. 2018 IBC section 107. Mechanical N/A Electrical N/A Plumbing N/A |
||
08/30/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-0723-01866 130 E CONGRESS ST Zoning C-1 TRANSMITTAL DATE:‎August 30, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. COMMENT: Zoning cannot approve until the historic review has been approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
08/04/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/02/2023 | PDSD Application Completeness | REVIEW COMPLETED |