Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0723-01807
Parcel: 11808035A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0723-01807
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/27/2023 Site Zoning APPROVED
07/28/2023 Site Engineering NOT REQUIRED
08/08/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
08/08/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 8/8/2023 9:10:01 AM
See the building review comments.



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 8/8/2023 9:08:06 AM
1) Sheet T-1: Scope of work note #10 states the vent hood shroud is being replaced but there are not any details on sheet M1. 2018 IBC Section 107

2) Sheet A-1: Include accessible signage. 2009 ICC A117.1

3) Sheet P-1: There are a couple details for floor drains but there are not any floor drains shown on the floor plans and plumbing isometric. 2018 IPC Section 106.3.1.

4) Sheet P-1: The hand sink drain is not shown on the Dishwasher Drain Detail and the plumbing isometric. 2018 IPC Section 106.3.1.

5) Sheet E-1: Show all new or existing emergency lights and exit signs. 2018 IBC Sections 1008, 1013.

6) Sheet E-1: Include lighting energy code compliance for lighting efficiency and controls. 2018 IECC Section C405.



Mechanical(M) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 8/8/2023 9:09:18 AM
See the building review comments



Electrical(E) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 8/8/2023 9:08:43 AM
See the building review comments.



Plumbing(P) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 8/8/2023 9:09:39 AM
See the building review comments.
07/30/2023 Fire New Construction REVIEW COMPLETED
07/27/2023 PDSD Application Completeness REVIEW COMPLETED