Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0723-01807
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/27/2023 | Site Zoning | APPROVED | |||
07/28/2023 | Site Engineering | NOT REQUIRED | |||
08/08/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/08/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/8/2023 9:10:01 AM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/8/2023 9:08:06 AM 1) Sheet T-1: Scope of work note #10 states the vent hood shroud is being replaced but there are not any details on sheet M1. 2018 IBC Section 107 2) Sheet A-1: Include accessible signage. 2009 ICC A117.1 3) Sheet P-1: There are a couple details for floor drains but there are not any floor drains shown on the floor plans and plumbing isometric. 2018 IPC Section 106.3.1. 4) Sheet P-1: The hand sink drain is not shown on the Dishwasher Drain Detail and the plumbing isometric. 2018 IPC Section 106.3.1. 5) Sheet E-1: Show all new or existing emergency lights and exit signs. 2018 IBC Sections 1008, 1013. 6) Sheet E-1: Include lighting energy code compliance for lighting efficiency and controls. 2018 IECC Section C405. Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/8/2023 9:09:18 AM See the building review comments Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/8/2023 9:08:43 AM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/8/2023 9:09:39 AM See the building review comments. |
||
07/30/2023 | Fire New Construction | REVIEW COMPLETED | |||
07/27/2023 | PDSD Application Completeness | REVIEW COMPLETED |