Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0723-01804
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/06/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/05/2024 | Air Balancing/Commissioning Report (Deferred Submittal) | REQUIRES RESUBMIT | Ventilation systems shall be balanced by individuals holding current certification from the Associated Air Balance Council (AABC), the National Environmental Balancing Bureau (NEBB) or other approved agencies. Final reports shall be provided to the engineer of record and to the code official prior to the issuance of a certificate of occupancy. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. | ||
06/06/2024 | Welding Inspection (Deferred Submittal) | REQUIRES RESUBMIT | Please submit your revised documents along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Please have Engineer Seal the exception letter (page 40 of the special inspection document) and address the lack of a Rod Heater for the low hydrogen rods, as reported by the inspector. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
06/06/2024 | Concrete Installation Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
06/06/2024 | Masonry Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
06/04/2024 | PDSD Application Completeness | REVIEW COMPLETED | |||
06/06/2024 | Post-Installed Anchor Inspection (Deferred Submittal) | REVIEW COMPLETED |