Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0723-01804
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/28/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/09/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 8/9/2023 12:14:55 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 8/4/2023 1:10:13 AM 1. Sheet A-0: The listed applicable codes provided are incorrect. Provide a complete list of the adopted and applicable codes by the City of Tucson. 2. General: No detailed egress plan provided. Provide a detailed egress plan. 3. General: No site plan provided. Provide an architectural site plan. 4. General: Provide within the site plans, drawings that clearly indicate the accessible routes within the site and site arrival points that connect the accessible parking to the accessible entrances that are in accordance with Section 206.2.1 and 206.2.2. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Conditionally Approved Reason: Date Completed : 7/27/2023 10:03:17 PM Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 7/31/2023 4:21:57 PM Electrical Review of AutoZone By: Ron Ross PE E2: Need to identify/show the Panels A and B. This is needed to support/verify Short Circuit calculations that are required by the City of Tucson. E4: The city of Tucson requires short circuit calculations to all new power panels from the Utility transformer. For this design, it would be from the xfmr to the Meter section/MCB, and from the MCB to each panel. All Utilities in the Tucson area provide an estimate of the available short circuit fault for their transformers. If the transformer size is not known, you can estimate the size of transformer required by the NEC ie 112 KVA and use the values provided by the utility for that size transformer. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Conditionally Approved Reason: Date Completed : 8/6/2023 10:48:18 PM First Plumbing Review: OK Subject to field inspections |
||
08/13/2023 | Fire New Construction | REQUIRES RESUBMIT | -Resolve building comments. john.vincent@tucsonaz.gov 5203495581 |
||
07/28/2023 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
07/26/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0723-01804 Address Unknown - C-2 AutoZone (1st Review) TRANSMITTAL: July 26, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in C-2 zone (UDC 4.7.21), General Merchandise Sales is an allowed use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.9.B.1. 1. Zoning has reviewed the building plan for compliance with Development Package (DP) TD-DEV-0223-00143, and although the plans appear to match until the DP is approved by all review agencies Zoning cannot approve this plan. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
08/28/2023 | Water - PDSD | REQUIRES RESUBMIT | Provide a site plan showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018 | ||
07/25/2023 | PDSD Application Completeness | REVIEW COMPLETED |