Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0723-01704
Parcel: 132191530

Address:
2104 E AJO WY

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0723-01704
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/14/2023 Water - PDSD APPROVED
08/14/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
07/28/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Denied
Reason:
Date Completed : 7/27/2023 11:13:08 AM
1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1.
2. Structural steel, components and fasteners that are exposed to weather are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1.
3. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection.
1. Provide galvanized bolts on the framing connections that are galvanized.
2. Refer to drawing S301, Roof Framing Plan. A beam CB3 is marked at Line A and 3. Canopy beam schedule does not show this beam. Verify and make revisions as needed.
3. Refer to Structural Calculations pages 99, 100 and 101 for the Lateral Analysis Diaphragm Check. The Enercalc calculations show member failing in Bending and Shear. Verify and make revisions as needed.
4. Refer to Structural Drawing S301, Roof Framing Plan. The Plan shows RTU’s with weights 500# and 600#. Refer to Mechanical Drawing M1, the Schedule shows RTU’s weights as 780#. Verify and make revisions as needed.

Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 7/18/2023 2:28:57 PM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 7/15/2023 12:20:29 PM
Approved/subject to field approval




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 7/18/2023 10:37:05 AM
Electrical Review of the Shops Building
By: Ron Ross PE
E201 ELECTRICAL POWER ROOF PLAN: Could not locate Keyed Note 6.



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 7/26/2023 10:18:37 PM
First Plumbing Review:
1). hose bibs on plan page P200 need individual shutoff valves. -IPC 606.2
2). Grease interceptor on plan page P200 needs to be vented. -IPC 1003.9
3). Plan page P200 or P300 needs to illustrate the hot & cold piping to the service sink. -IPC 106.3.1
4). Plan page P200 needs to illustrate the Primary & secondary roof drain conductors along with sized to their termination points as stated in keynote #3 -IPC 106.3.1, 1106.2
5). Plumbing plan pages P201 or P301 need to include the storm piping slope to show the GPM loads stated on P201 to be conveyed by the 4" pipe is in compliance with table -IPC 1106.2
6). need more information & illustrations about note #3 on P201 stating pipe primary roof leaders to trench drain? where is this located? How does it function? #3 is not shown on P201 illustration plan. -IPC 106.3.1, 1101.2
7). Sanitary sewer connection locations on pages P200 & DP plan page don't correlate -IPC 106.3.1
07/21/2023 Site Engineering REQUIRES RESUBMIT 1. The trash enclosure on the approved development package, DP20-0189, does not match the trash enclosure on sheet A103. Please revise DP20-0189 to match the proposed plans or update the CONS sheets to match the approved development package.

Lianne Evans
lianne.evans@tucsonaz.gov
07/20/2023 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0723-01704
2104 E. Ajo Wy. – C-2
Shops Shell Building (1st Review)

TRANSMITTAL: July 20, 2023

Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in C-2 zone (UDC 4.7.21), Mixed use is an allowed use in the zone (UDC Table 4.8-4).

1. Zoning has reviewed the building plan for compliance with DP20-0189 and the site plan provided in the building plan set does not match the approved DP. If you are proposing changes a revised DP is required to be submitted and approved prior to approval of this building permit.

2. Several site details on sheet A103 do not match the details on the DP. Revise either the DP or building set so that the plans match.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
08/01/2023 Fire New Construction REVIEW COMPLETED
07/14/2023 PDSD Application Completeness REVIEW COMPLETED