Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0723-01638
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/16/2024 | Commercial Building | APPROVED | Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 12/10/2024 9:27:43 AM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 12/10/2024 9:27:35 AM |
||
12/16/2024 | Commercial Electrical | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 12/11/2024 3:35:08 PM |
||
N/A | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
N/A | Fire New Construction | PENDING ASSIGNMENT | |||
N/A | Site Engineering | PENDING ASSIGNMENT | |||
N/A | Site Zoning | PENDING ASSIGNMENT | |||
N/A | Water - PDSD | PENDING ASSIGNMENT | |||
12/16/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 12/16/2024 9:06:31 AM 1. General - Provide Revision Narrative Letter. The document submitted does not confirm the revision to the location/Plan Sheet on documents provided. On document please follow Resubmittal Directions. RESUBMITTAL DIRECTIONS: • All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta identification number, with a brief explanation of the change(s). • As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is required for approval and permitting. • Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to each of the noted plan review comments items. • This response narrative must clearly address how each issue was corrected or resolved and indicate where the information may be found within the construction documents. The response narrative must be typewritten, on a letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may result in review delays or rejection of the resubmittal. • Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.) have been revised according to the above directions. Please resubmit the complete revised plan set with a separate copy of response narrative PDF through the municipality to complete the review. • Review of revised construction documents in response to this letter may take upwards of 5 (five) business days, depending on the size of the project and the volume of plans in queue at time of resubmittal. |
||
12/16/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 12/15/2024 4:34:44 PM REVISED PLUMBING REVIEW: 1). PLAN PAGE P-100: Red clouded restroom sanitary drain line is undersized. The sanitary drain to the clouded restroom needs to be 3" minimum. -2018 IPC Table 709.1 |
||
12/09/2024 | PDSD Application Completeness | REVIEW COMPLETED |