Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0723-01638
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/07/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/07/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Approved with Comments Reason: Date Completed : 9/6/2023 2:37:17 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/6/2023 10:00:37 AM Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Approved with Comments Reason: Date Completed : 8/31/2023 10:14:00 PM 1. The process of “doping,” involving use of a volatile flammable solvent, or of painting, shall be carried on in a separate detached building equipped with automatic fire-extinguishing equipment in accordance with Section 903. (IBC2018,412.4.5) sheet m200 Complied 2. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm for on sheet M200 (IMC2018,606.2.1) Complied Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 9/6/2023 10:27:54 AM Electrical Review of SkyWest By: Ron Ross PE E2.05 POWER PLAN – AREA B: Could not locate Keynote 11. E2.09 HVAC POWER PLAN - AREA B: Missing Keynotes 5. E2.15 SPECIAL SYSTEMS PLAN - AREA D: Missing Keynote 7. E3.00 ONE LINE DIAGRAM & DETAILS: Generator might be undersized for load. Should confirm and upsize if required. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2023 1:56:25 PM 1). Resolved-The 2.5" gas line piping configuration at the building entrance on plan page P-001 doesn't correlate with plan page P-101. Plan page P-001 doesn't show an incoming line to the meter and shows a 2.5" line being piped off in an unknown direction. pages to need to correlate. -IFGC 106.3.1 2). Resolved-The #5 sediment trap detail on plan page P401 needs to match # 6 detail on the same page, the sediment trap can't be installed on the horizontal run. -IFGC 408.4 3). Resolved-Dump station water supply Detail #3 on P401 needs to show a high hazard RPZ backflow for this application. - IPC table 608.1 4). Unresolved-Add gutter & downspout sizing calculations to plan page A22 -IPC 1106.1, 1106.3, 1106.6 **Calculations added are referring to UPC code, Tucson has adopted the IPC** The calculations incorrectly reference IBC Table 1106 - these calculations should be based on the IPC. The calculations for Area A show two gutter sizes - one should be for down spouts. 5). Unresolved-Show gutter & downspout locations & sizes on Plan page A22 -IPC 1106.3, 1106.6 ** locations not clear** The calculations and maximum roof area per down spout were based on a maximum downspout spacing of 25ft but the spacings shown on the elevation views (Sheets A51, A52) exceed 25ft. Please revise and coordinate the storm drainage calculations and elevation view details. 6). Resolved-Lavatories need ASSE 1070 mixing valves update plan page P-001 or sheet 224000-8 of spec manual -IPC 419.5 7). Resolved-Spec manual or plumbing plans need to in gas piping, fittings, & hanger information. - IFGC 403 8). Resolved-Compressor C1 & C2 locations not clear on plan page P101 -IPC 106.3.1 9). Resolved-Add compressor detail to plan page P401 -IPC 106.3.1 |
||
10/27/2023 | Water - PDSD | REQUIRES RESUBMIT | The utility plan (C6.0/24) has not been added to the building plan set. [Second comment: The utility plan (C6.0/24) from the development package has all of the required information, but it needs to be included in the building plan set.] [Initial comment: An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018.] | ||
10/04/2023 | PDSD Application Completeness | REVIEW COMPLETED |