Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0723-01638
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/08/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/08/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 3/6/2024 2:59:27 PM 1. GENERAL - FIRM REGISTRATION: Per the Arizona Revised Statutes, Chapter 32, Rule 141, a firm shall not engage in the practice of any board-regulated profession or occupation unless the firm is registered with the board”. The construction documents must indicate the name and registration number of the engineering firm by which the signing engineer is employed. Please update the construction documents to comply with this provision. Refer to the Arizona State Board of Technical Registration (https://btr.az.gov/public/registered-firm-branch-search) for more information. 2. GENERAL - VERIFICATION FROM EOR: Section 107.3.4.1 of the 2018 International Building Code lists the requirements for construction documents provided as deferred submittals: "Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance to the design of the building". This notation may be in the form of a Review Stamp affixed to the PEMB shop drawings or a letter, signed and sealed by the engineer of record, that confirms that the shop drawings have been reviewed and are in general conformance with their original construction drawings. Structural Denied Building N/A Mechanical N/A Electrical N/A Plumbing N/A |
||
02/23/2024 | PDSD Application Completeness | REVIEW COMPLETED |