Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0723-01633
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/23/2024 | Water Sterilization Report (Deferred Submittal) Express | APPROVED | |||
| 09/23/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/23/2024 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | The submitted document is not an air balance report, it is a copy of drawing M1which includes the sequence of operation of a CO2 alarm system. Submit an air balance report to verify that the ventilation system is complete and operating as designed. Reference: Section 403.3.1.5, IMC 2018. | ||
| 09/20/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |