Permit Number: TC-COM-0626-00991
Parcel: 13006004A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0626-00991
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/17/2026 Outdoor Lighting Standard APPROVED
07/10/2026 Site Engineering Standard APPROVED
07/22/2026 Site Zoning Standard APPROVED
07/21/2026 Water - PDSD Standard APPROVED
07/22/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/21/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov
1. Sheet S3.0 – Keynote 2 & 3: Please provide a referenced typical structural detail for the support and suspension of the kitchen hoods from the engineered wood I-joists. As well as providing details for all other mechanical equipment on the roof. The detail shall identify all framing members, hangers, connectors, fasteners, and their sizes, spacing, and attachment methods. Provide engineering demonstrating that the concentrated and suspended loads are adequately transferred to the structural framing in accordance with the I-joist manufacturer's requirements. IBC 107.2.7
2. Sheet A301: Please revise the construction documents to provide complete, referenced wall and roof assembly sections with referenced call outs. Additionally, please include detail sections for all applicable wall sections and roof assemblies showing the required construction components, including but not limited to:
• Structural framing and connections
• Interior and exterior finishes
• Insulation and air/water-resistive barrier assemblies
• Flashing and weatherproofing details
• Material specifications and thicknesses
• Required clearances (including weep screed and foundation clearances, where applicable)
• Attachment methods and fastening schedules
• Interface details at roofs, openings, parapets, and other transitions
The construction documents shall contain sufficient detail to clearly demonstrate code compliance and provide adequate information for plan review and construction. IBC 107.2.1
Sheet A602: Please provide the applicable ICC Evaluation Service Report (ICC-ESR), or equivalent evaluation report, for the proposed stucco system and the air/water-resistive barrier. IBC 107.2.1
Additionally, revise the Special Inspections schedule to include inspections for the EIFS and liquid-applied air/water-resistive barrier systems, where required by the applicable ICC-ESR or equivalent evaluation report or IBC 1705.17 & 1705.17.1


Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
07/17/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0626-00991 (3538 E ELLINGTON PL Unit:BLDG 6 TUCSON, AZ 85713)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. KeyNotes are missing. EP101. Provide all keynotes as called out on the power plan.
2. Provide complete compliance with the 2018 IECC for the interior lighting, including sensors and lighting controls as required. (typically COMcheck.).
3. Note or show all conduits passing into or out-of the walk-in freezer/cooler unit, with sealant and expansion joints per NEC 300.7(A) & (B). Provide detail as necessary.
4. Provide GFCI protection for all receptacles in the kitchen, including the ‘Cord reel recepts’, NEC 210.8(B).
5. Provide and show GFCI protection for all appliances as listed in NEC 210.8(D).
07/21/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0626-00991
ADDRESS/PARCEL: 3538 E ELLINGTON PL Unit:BLDG 6 TUCSON, AZ 85713

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. Please show that the walk-in cooler and walk-in freezer comply with the construction and efficiency requirements of Sections C403.10.2 and C403.10.2.1, IECC 2018.
07/21/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0626-00991
ADDRESS/PARCEL: 3538 E ELLINGTON PL Unit:BLDG 6 TUCSON, AZ 85713

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. The Sewer and Vent Riser Diagram does not appear to be consistent with the Water and Sewer Plumbing Plan on Sheet P101. On Sheet P101, a 4-inch building sewer with a ground cleanout (GCO) continues through the building, with the discharge from the grease interceptor connecting downstream. However, the riser diagram shows the 4 inch line at the GCO serving FD1, FS2, and fixtures K33, K35, and K36 through the grease interceptor. Please clarify and revise the plans as necessary so the riser diagram and plumbing plan are consistent. Reference: Section 107.2.1, IBC 2024.
07/21/2026 Fire New Construction Standard REVIEW COMPLETED
07/01/2026 PDSD Application Completeness Express REVIEW COMPLETED