Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0626-00968
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/17/2026 | Commercial Building Standard | APPROVED | |||
| 07/14/2026 | Site Zoning Standard | APPROVED | |||
| 07/14/2026 | Fire New Construction Standard | NOT REQUIRED | |||
| 07/16/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 07/10/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 07/17/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/16/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical review TC-COM-0626-00968 (920 E TUCSON MARKETPLACE BL TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant (Electrical). Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Where subject to physical damage, conductors, raceways, equipment, and cables shall be protected. Clearly show the location of the new sub-panels 1-4, combiner panel and Gateway panel. Provide protection against damage as necessary. NEC 300.4 Protection Against Physical Damage, NEC110.27(B) Prevent Physical Damage. Verify EV charging equipment is protected from physical damage or provide tire stops or bollards or other means to protect from car impacts. 3. Provide conduit depth per NEC 300.5. 4. Detail how the Line-side tap is being done and show this interconnection does not violate the listing of the exiting 1200A Disconnect Switch, NEC 110.3. 5. Provide Fault Current Analysis and show new equipment, breakers, chargers and panels AIC rating sufficient to withstand the calculated Fault Current. Provide Available Fault Current calculations from TEP transformers to all new equipment, 2023 NEC 110.24, NEC 110.9, 110.10. 6. Clarify the wire count in wire TAG #s 4, 4A,4T. Each conduit should contain the parallel ungrounded conductors and the grounded conductor and grounding conductor. NEC 310.10, 310.10(G). Must have the same number of conductors in each parallel conduit. 7. Show the location of the panels and combiners on the Electrical Plan with clear working space compliance, 2017 NEC 110.26(A) 8. Provide structural details and calculations for the attachment of the sub-panels/combiner panel to the structure of the canopy, NEC 110.13, IBC 107.1. 9. Show new electrical wiring meets the requirements of NEC 514.4, and Parts II & III of NEC 501. 10. Show new electrical complies with wiring methods as required in NEC 514.7, NEC 514.8, Sealing per 514.9, disconnects per 514.11. |
||
| 06/26/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |