Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0626-00925
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/23/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/18/2026 | Addressing Validation | REQUIRES RESUBMIT | If you have questions regarding this review, please contact CDRC@tucsonaz.gov. Please include the Unit Number in the full property address on each page of construction plan. The application has unit number 256 but none are included on the site plan. Please reupload an updated plan after all other reviews are complete. If not please include a note explaining why a unit is not needed here. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf |
||
| 06/23/2026 | Commercial Mechanical Express | REQUIRES RESUBMIT | 1. Clarify the location of the proposed activity. Provide a site plan to show where 2525 N Los Altos Ave, Unit 256, is located. Reference: Section 107.2.1, IBC 2024. 2. Provide the specifications for the replacement HVAC unit (e.g. manufacturer, model number, heating/cooling capacity, and efficiency ratings). The replacement units shall have an efficiency rating that is greater than or equal to the minimum required by the Department of Energy that went into effect on January 1, 2023. 3. Beginning on January 1, 2023, the Department of Energy minimum efficiency standards for central air conditioning systems was increased from 14.0 to 15.0 SEER using DOE’s pre-2023 appendix M test procedure. Also, based on the DOE definition of the installation of a central air conditioner, all equipment not operational on January 1, 2023, in the Southwest region, must have an Energy Guide label identifying a SEER2 or SEER2/EER2 rating. 4. Replacement of commercial AC units constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacities of the units being installed . Reference: Section C403.3.1, IECC 2018. 5. While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. Reference: Section C503.3, IECC 2018. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 06/18/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |