Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0626-00897
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Electrical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Mechanical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | Outdoor Lighting Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 06/22/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-0626-00897 (1st Review) Project: Interior Remodel of existing Walmart Supermarket building. Location: 1650 W VALENCIA RD Review Date: 6/22/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Reviewer Contact: Marco.contreras@tucsonaz.gov Related cases: Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering. To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files. Site Engineering Review Comments: 1. The proposed new sidewalks, pedestrian pathway connections, and all other exterior modifications proposed at this commercial site will require the submission of a Development Package (Site plan) in accordance with UDC §7.4.3.E. Per UDC §3.3.3.G.2.c, A Development Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdfPlease coordinate through email to confirm any additional studies required based on site conditions & reviewer comments. Note that the Development Package is a separate permit submittal, and must be processed independently of, the building plans. 2. Site Engineering is unable to fully review and approve permit TC-COM-0626-00897 until the associated Development Package is reviewed and approved by all reviewers. |
||
| 06/23/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/18/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |