Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0626-00891
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/10/2026 | Commercial Building Standard | APPROVED | |||
| 07/09/2026 | Commercial Electrical Standard | APPROVED | Approved with comments added to plans: see sheet E2.1. 1. Reference sheet E2.1. a. Circuit B-7 to the EWC, provide GFCI protection per NEC 210.8(D)(2). Readily accessible per NEC 210.8. b. Circuit B-24 in the Janitor’s closet, room 122, provide GFCI protection per NEC 210.8(B)(7) & (8). |
||
| 07/13/2026 | Commercial Mechanical Standard | APPROVED | |||
| 07/09/2026 | Site Zoning Standard | APPROVED | |||
| 07/13/2026 | Water - PDSD Standard | APPROVED | |||
| 07/09/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 06/18/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 07/13/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/13/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide a minimum of two drinking fountains; one accessible for standing persons and one accessible for persons confined to a wheelchair. Reference: Section 410.3.1, IPC 2024 (see also exception 1,Section 410.3 and Section 410.4, IPC 2024, as amended by the City of Tucson). 2. Provide tempered water for the lavatories with a device conforming to ASSE 1070. Reference: Section 419.5, IPC 2024. 3. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10 seconds for accessibility. Reference: Section 604.4, IPC 2024 and Section 606.4, ICC/ANSI A117.1-09. 4. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5.1, IECC 2024. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 06/22/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/18/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |