Permit Number: TC-COM-0626-00887
Parcel: 12106008A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.1

Permit Number - TC-COM-0626-00887
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/02/2026 Commercial Building APPROVED
06/24/2026 Commercial Electrical APPROVED Approved with comment added to plans: All conduits passing into or out-of all refrigeration/freezer units shall be equipped with sealant and expansion joints per NEC 300.7(A) & (B).
07/02/2026 Site Zoning APPROVED
07/02/2026 Water - PDSD APPROVED
06/18/2026 Site Engineering NOT REQUIRED
07/02/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/17/2026 Addressing Validation REQUIRES RESUBMIT If you have questions regarding this Completeness Review, please contact Maribel Arevalo at CDRC@tucsonaz.gov
Incomplete submittal: Plans submitted contain a different address that the permit application. The permit application has an address of 5561 E SPEEDWAY BL TUCSON, AZ 85712, and the plans have an address of 5561 SPEEDWAY. Please update your plans and resubmit.
Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf
07/02/2026 Commercial Mechanical REQUIRES RESUBMIT 1. Clarify the design of the HVAC system. The mechanical equipment schedule calls out a single, 3.5-ton split system heat pump, the mechanical floor plan shows two, 3.5-ton split system heat pumps, and the air balance schedule shows two 3-ton rooftop units. Reference: Section 107.2.1, IBC 2024.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Sections C403.1.1 and C403.3.1, IECC 2018.
3. The proposed single-phase air conditioning equipment, less than 65,000 BTU/H do not meet the minimum efficiency requirements set by the US Department of Energy Code of Federal Regulations in January 1, 2023: DOE 10 CFR 430 (e.g., SEER2). The minimum efficiency for a split system heat pump in the Southwest region is 14.3 SEER2 and 7.5 HSPF2 (equivalent to 15 SEER and 8.8 HSPF). Reference: Section C403.3.2, IECC 2018.
4. Provide information on the sequence of operation for the restroom exhaust fan to show that all of the air supplied to the restroom will be exhausted during the hours of operation. Reference: Footnote g, Table 403.3.1.1, IMC 2024
5. Secure the refrigerant circuit access ports of the condensing units to prevent unauthorized access. Reference: Section 1101.9, IMC 2024.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
07/02/2026 Commercial Plumbing REQUIRES RESUBMIT 1. Provide information to show how the proposed water heater is to be supported from the building structure. Reference: Section 301.2, IPC 2024.
2. Verify that the relief port for the specified backflow preventer is directed to either an approved indirect waste receptor or to the outside, where water leakage will not cause damage. Reference: Sections 303.2 and 608.14.3, IPC 2024.
3. Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5.1, IECC 2018
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
06/22/2026 Fire New Construction REVIEW COMPLETED
06/17/2026 PDSD Application Completeness Express REVIEW COMPLETED