Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0626-00884
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/01/2026 | Commercial Electrical Standard | APPROVED | |||
| 07/08/2026 | Site Zoning Standard | APPROVED | |||
| 07/10/2026 | Water - PDSD Standard | APPROVED | |||
| 07/09/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 06/18/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 07/10/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/01/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Willdan Engineering Phoenix Ed Kulik ekulik@willdan.com 1. Sheet C1 Provide a site plan showing accessible path of travel to parking and the public way. 2. Sheet A1.0 Provide protrusion protection at drinking fountains or place in alcove. ICCA117 3. Sheet A1.0 Show wall and ceiling rating for storage under stairs. 4. Sheet A1.0 Provide details on installing new openings for windows. Show exterior wall details for repairing exterior wall, Provide manufactures cut sheet for windows. 5. Sheet A1.1 Provide details and calculations for new Guard at stair well. 6. Sheet A3.0 Show Accessible access to break station Sink. |
||
| 07/01/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Sheet M4 Provide documentation that the mechanical system meets or exceeds the 2018 IECC. | ||
| 07/01/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Sheet P4 Install Studor Vent per manufactures listing. | ||
| 06/22/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/18/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |