Permit Number: TC-COM-0626-00815
Parcel: 11205055C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0626-00815
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/22/2026 Commercial Electrical Standard APPROVED Approved with GFCI notes added to sheet E600.
06/29/2026 Water - PDSD Standard APPROVED
06/30/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/30/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov


1. Please revise the plans to add a vertical grab bar at the Children's rest rooms. Provide vertical grab bar per 2017 ICC A117.1 609.4.2 and Figure 609.4.2(A)

Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
06/30/2026 Commercial Mechanical Standard REQUIRES RESUBMIT 1. The 2024 International Mechanical Code with Local Amendments is the relevant code for this project, not the 2018 IMC (see M301).
2. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted during the hours of operation. Reference: Footnote g, Table 403.3.1.1, IMC 2024.
3. Correct the footnote for the OSA Ventilation Calculation. The air balancing requirement is now in Section 608.1, IMC 2024, as amended by the City of Tucson.
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
06/30/2026 Commercial Plumbing Standard REQUIRES RESUBMIT The 2024 IBC and the 2024 IPC are the controlling codes for this activity, not the 2018 IBC and the 2018 IPC (see Plumbing General Notes and Water Conservation Notes, P301), . Reference: Section 101.2, IPC 2024.
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
06/22/2026 Outdoor Lighting Standard REQUIRES RESUBMIT Outdoor Lighting Review TC-COM-0626-00815 (3100 N CAMPBELL AV TUCSON, AZ 85719)

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
Outdoor Lighting Review:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf


1. The replacement, relocation and installation of new lighting fixtures requires compliance with the City of Tucson Outdoor Lighting Code.
2. Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan, both new and existing. Number the light fixtures on your lighting fixture table and use the same number on your site plan.
3. List the Lighting Area per OLC (typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1.
4. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation.
5. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4.
6. Show lamps with a maximum of 3500K color temperature, OLC 402.1.
7. Provide the manufacturer’s specification sheets for the outdoor lighting fixtures. Include the lumen and color temperature values for each outdoor fixture type.
8. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2.

https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf

9. Specify any exceptions used.

10. Provide Curfew lighting controls If applicable Per section 403.
06/29/2026 Site Engineering Standard REQUIRES RESUBMIT Site Engineering Review

TC-COM-0626-00815
3100 N CAMPBELL AV

Description: TENANT IMPROVEMENT AND ASSOCIATED SITE ENHANCEMENTS AS REQUIRED FOR THE NEW USE.

Site Engineering comments are as follows:

1. A Development Package is required for the scope of this project. The content requirements may be found in Administrative Manual Section 2-06. The Development Package is a separate submittal and must be approved by all reviewers prior to the approval of this commercial permit.
2. This project lies within the Wilson Av Wash floodplain and will require a floodplain use permit (FPU). An FPU has been submitted on your behalf. For the Floodplain Use Permit, submit a cost estimate for the improvements within the building, i.e. the tenant improvement portion exclusive of any of the site work. The estimate should be submitted on the contractor's letterhead. Include separate lines for materials, labor, and any warranties. This structure is subject to substantial improvement calculations and potential floodplain compliance requirements.
3. Site Engineering cannot approve this permit without an issued floodplain use permit. The floodplain use permit is a separate submittal that may be found in the sub-records of this permit on the TDC Portal.
4. Ensure that the plans for all three submittals (the FPU, Development Package, and Commercial Building permit) match one another and re-submit upon satisfaction of the above-mentioned conditions.
5. Additional comments may be forthcoming.

*Please submit revised drawings along with a detailed response letter stating how each resubmittal comment has been addressed*

To re-submit, visit the Tucson Development Center Online at:
https://tdc-online.tucsonaz.gov/#/home

The instructions for resubmittal can be found at: Revisions and Resubmittals

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
06/26/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Bobby Parsons
Zoning Section Review

PROJECT:
TC-COM-0626-00815
3100 N. Campbell Ave Tucson, AZ 85719
TI and Site Improvements (1st Review)

TRANSMITTAL DATE: 6/26/2026

This site is located in the C-1 zone (UDC 4.7.20). Educational Use is a permitted use in this zone subject to Use Specific Standards 4.9.3.D.1 - 7 and 4.9.13.O (UDC Table 4.8-4).

Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed.

1. Comment: As parking lot modifications are being proposed, a Development Package will be required. Per UDC Article 3.3.3.G.2.c, a site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the minimum requirements is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/submittal_requirements.pdf. Site zoning is unable to approve this building permit until the DP has been approved by all reviewers.
2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
06/23/2026 Fire New Construction Standard REVIEW COMPLETED
06/08/2026 PDSD Application Completeness Express REVIEW COMPLETED