Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0626-00815
Parcel: 11205055C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0626-00815
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/19/2026 Commercial Building Standard APPROVED
08/04/2026 Commercial Electrical Standard APPROVED
08/19/2026 Commercial Mechanical Standard APPROVED
08/19/2026 Commercial Plumbing Standard APPROVED
08/04/2026 Outdoor Lighting Standard APPROVED
08/20/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/20/2026 Site Engineering Standard REQUIRES RESUBMIT Site Engineering Review

TC-COM-0626-00815
3100 N CAMPBELL AV

Date of Transmission: 8/20/2026

Description: TENANT IMPROVEMENT TO THE EXISTING OFFICE BUILDING.

*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.*

City of Tucson Code:
https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf

Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering comments are as follows:

1. This commercial building permit cannot be approved until the associated development package, TD-DEV-0726-00180, is approved by all reviewers. UDC Article 3.3.3.G.7.a
2. Ensure that the plans for the Development Package, TD-DEV-0726-00180, and Commercial Building submission match one another and re-submit upon satisfaction of the above-mentioned condition.
3. Additional comments may be forthcoming depending on the content of files submitted for subsequent review cycles.

Once the associated development package is approved by all reviewers, please submit revised drawings along with a detailed response letter stating how each resubmittal comment has been addressed.

To re-submit, visit the Tucson Development Center Online at:
https://cityoftucsonaz-energovweb.tylerhost.net/apps/selfservice#/home

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
08/18/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Krista Hansen
Planning & Development Services Department – Zoning Review Section

PROJECT: TC-COM-0626-00815 - TD-DEV-0726-00180
3100 N Campbell Ave
TI and Site Improvements (2nd Review)

TRANSMITTAL DATE: 8/18/2026


This site is zoned C-1 (UDC Section 4.7.20). Educational Use is a permitted use in this zone subject to Use Specific Standards 4.9.3.D.1 - 7 and 4.9.13.O (UDC Table 4.8-4).


Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed.

01. COMMENT: Zoning has reviewed the building plans for compliance with development package (DP) TD-DEV-0726-00180 and although the plans appear to match, Zoning cannot approve the building plan until the DP is approved by all review agencies.

02. COMMENT: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted.


For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov
07/29/2026 PDSD Application Completeness Express REVIEW COMPLETED