Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0626-00815
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/19/2026 | Commercial Building Standard | APPROVED | |||
| 08/04/2026 | Commercial Electrical Standard | APPROVED | |||
| 08/19/2026 | Commercial Mechanical Standard | APPROVED | |||
| 08/19/2026 | Commercial Plumbing Standard | APPROVED | |||
| 08/04/2026 | Outdoor Lighting Standard | APPROVED | |||
| 08/20/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/20/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Site Engineering Review TC-COM-0626-00815 3100 N CAMPBELL AV Date of Transmission: 8/20/2026 Description: TENANT IMPROVEMENT TO THE EXISTING OFFICE BUILDING. *This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.* City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering comments are as follows: 1. This commercial building permit cannot be approved until the associated development package, TD-DEV-0726-00180, is approved by all reviewers. UDC Article 3.3.3.G.7.a 2. Ensure that the plans for the Development Package, TD-DEV-0726-00180, and Commercial Building submission match one another and re-submit upon satisfaction of the above-mentioned condition. 3. Additional comments may be forthcoming depending on the content of files submitted for subsequent review cycles. Once the associated development package is approved by all reviewers, please submit revised drawings along with a detailed response letter stating how each resubmittal comment has been addressed. To re-submit, visit the Tucson Development Center Online at: https://cityoftucsonaz-energovweb.tylerhost.net/apps/selfservice#/home Engineering Associate: Ryan Insalaco ryan.insalaco@tucsonaz.gov |
||
| 08/18/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Krista Hansen Planning & Development Services Department – Zoning Review Section PROJECT: TC-COM-0626-00815 - TD-DEV-0726-00180 3100 N Campbell Ave TI and Site Improvements (2nd Review) TRANSMITTAL DATE: 8/18/2026 This site is zoned C-1 (UDC Section 4.7.20). Educational Use is a permitted use in this zone subject to Use Specific Standards 4.9.3.D.1 - 7 and 4.9.13.O (UDC Table 4.8-4). Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 01. COMMENT: Zoning has reviewed the building plans for compliance with development package (DP) TD-DEV-0726-00180 and although the plans appear to match, Zoning cannot approve the building plan until the DP is approved by all review agencies. 02. COMMENT: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov |
||
| 07/29/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |