Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0625-01285
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/09/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | The submitted air balance report shows that RTU-9 is delivering only 83% of the required total air flowrate and less than 75% of the design air flowrate to the meeting rooms 123 and 124. Submit the report to the engineer for evaluation and resolution of the issue. Submit a revised air balance report once the problem has been resolved. | ||
| 12/08/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |