Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0625-01285
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/12/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | Submit an addendum to the air balance report showing the corrected air flow rates for the RTU-9 system along with the statement from the engineer accepting the current situation. [Initial comment: The submitted air balance report shows that RTU-9 is delivering only 83% of the required total air flowrate and less than 75% of the design air flowrate to the meeting rooms 123 and 124. Submit the report to the engineer for evaluation and resolution of the issue. Submit a revised air balance report once the problem has been resolved.] | ||
| 12/10/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |