Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0625-01216
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/15/2025 Site Zoning Standard APPROVED
07/02/2025 Outdoor Lighting Standard NOT REQUIRED No modifications to the outdoor lighting.
07/02/2025 Site Engineering Standard NOT REQUIRED
07/15/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/14/2025 Commercial Building Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0625-01216
ADDRESS: (365 E SAHUARO ST Unit:BLDG 1 UNIT 1105 TUCSON, AZ 85705)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval.

COMMENTS:
1. COVER SHEET
a. At the top of the sheet.
i. Address is shown as 365 E Sahuaro St Apt 11105 (extra 1).
ii. Please correct to 365 E Sahuaro St BLDG 1 UNIT 1105 (Bldg 1 added and the extra 1 removed).
2. EVERY SHEET
a. Project Information.
i. Address is shown as 365 E Sahuaro St Apt 11105 (extra 1).
ii. Please correct to 365 E Sahuaro St BLDG 1 UNIT 1105 (Bldg 1 added and the extra 1 removed).
3. PLOT PLAN SHEET
a. BUILDING “A”
i. Correct to match the addressing department system.
ii. Correct to BUILDING “1”
b. BUILDING “B”
i. Correct to match the addressing department system.
ii. Correct to BUILDING “2”
c. BUILDING “C”
i. Correct to match the addressing department system.
ii. Correct to BUILDING “3”
4. ENLARGED SITE PLAN-2 SHEET
a. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1103.
b. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1104.
c. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1105.
5. STRUCTURAL DETAILS-2 SHEET
a. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1103.
b. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1104.
c. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1105.
6. STRUCTURAL DETAILS-3 SHEET
a. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1103.
b. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1104.
c. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1105.
7.
8. ELECTRICAL ELEVATION DETAILS-1
a. METERS 1, 2, 3, 4, and 5
i. Identify/label which Meter is assigned to BLDG 1 UNIT 1101.
ii. Identify/label which Meter is assigned to BLDG 1 UNIT 1102.
iii. Identify/label which Meter is assigned to BLDG 1 UNIT 1103.
iv. Identify/label which Meter is assigned to BLDG 1 UNIT 1104.
v. Identify/label which Meter is assigned to BLDG 1 UNIT 1105.
9. Please resubmit.

If you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976
07/02/2025 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review
TC-COM-0625-01211
TC-COM-0625-01212
TC-COM-0625-01214
TC-COM-0625-01215
TC-COM-0625-01216
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

>>> The following comments were not addressed.

1. Provide rapid shutdown/disconnect for each array at the service entrance of the building the array is on AND at the meter location the array feeds. REF Sheet ‘Plot Plan’: building B/2 and building C/3 have arrays that supply meters on 2 different buildings. Disconnects for these arrays are required to be on both buildings at the location of service entrance for each, NEC 690.15(A).
2. Show compliance with NEC 690.15(A), PV solar Disconnect Switch is greater than 10’ from the service entrance. REF Sheet ‘Plot Plan’: building B disconnects.
3. Provide additional electrical array notation showing which PV modules are associated with each individual unit meters.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
07/01/2025 Fire New Construction Standard REVIEW COMPLETED
06/24/2025 PDSD Application Completeness Express REVIEW COMPLETED