Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0625-01216
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/15/2025 | Site Zoning Standard | APPROVED | |||
| 07/02/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 07/02/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 07/15/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/14/2025 | Commercial Building Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0625-01216 ADDRESS: (365 E SAHUARO ST Unit:BLDG 1 UNIT 1105 TUCSON, AZ 85705) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. COMMENTS: 1. COVER SHEET a. At the top of the sheet. i. Address is shown as 365 E Sahuaro St Apt 11105 (extra 1). ii. Please correct to 365 E Sahuaro St BLDG 1 UNIT 1105 (Bldg 1 added and the extra 1 removed). 2. EVERY SHEET a. Project Information. i. Address is shown as 365 E Sahuaro St Apt 11105 (extra 1). ii. Please correct to 365 E Sahuaro St BLDG 1 UNIT 1105 (Bldg 1 added and the extra 1 removed). 3. PLOT PLAN SHEET a. BUILDING “A” i. Correct to match the addressing department system. ii. Correct to BUILDING “1” b. BUILDING “B” i. Correct to match the addressing department system. ii. Correct to BUILDING “2” c. BUILDING “C” i. Correct to match the addressing department system. ii. Correct to BUILDING “3” 4. ENLARGED SITE PLAN-2 SHEET a. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1103. b. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1104. c. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1105. 5. STRUCTURAL DETAILS-2 SHEET a. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1103. b. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1104. c. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1105. 6. STRUCTURAL DETAILS-3 SHEET a. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1103. b. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1104. c. Identify/label which 15 solar panels are assigned to BLDG 1 UNIT 1105. 7. 8. ELECTRICAL ELEVATION DETAILS-1 a. METERS 1, 2, 3, 4, and 5 i. Identify/label which Meter is assigned to BLDG 1 UNIT 1101. ii. Identify/label which Meter is assigned to BLDG 1 UNIT 1102. iii. Identify/label which Meter is assigned to BLDG 1 UNIT 1103. iv. Identify/label which Meter is assigned to BLDG 1 UNIT 1104. v. Identify/label which Meter is assigned to BLDG 1 UNIT 1105. 9. Please resubmit. If you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
| 07/02/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0625-01211 TC-COM-0625-01212 TC-COM-0625-01214 TC-COM-0625-01215 TC-COM-0625-01216 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). >>> The following comments were not addressed. 1. Provide rapid shutdown/disconnect for each array at the service entrance of the building the array is on AND at the meter location the array feeds. REF Sheet ‘Plot Plan’: building B/2 and building C/3 have arrays that supply meters on 2 different buildings. Disconnects for these arrays are required to be on both buildings at the location of service entrance for each, NEC 690.15(A). 2. Show compliance with NEC 690.15(A), PV solar Disconnect Switch is greater than 10’ from the service entrance. REF Sheet ‘Plot Plan’: building B disconnects. 3. Provide additional electrical array notation showing which PV modules are associated with each individual unit meters. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 07/01/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/24/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |