Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0625-01192
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/25/2025 | Commercial Electrical Standard | APPROVED | |||
| 08/25/2025 | Outdoor Lighting Standard | APPROVED | |||
| 08/18/2025 | Water - PDSD Standard | APPROVED | |||
| 09/08/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/08/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Calculation of the required minimum ventilation for air handlers serving multiple zones requires the balancing data (supply CFM) for each zone and the calculations described in Sections 403.3.1.1.2.3.1 through 403.3.1.1.2.3.4, IMC 2018. The office and the back of house show no ventilation being supplied. In addition, if the prep area is to be supplied with outside air via the exhaust fan, excess air will have to be supplied to the area transferring air to the prep area exhaust fan. Reference: Sections 401.2, 403.2.2, and 403.3.1.1.2.3, IMC 2018. [Initial comment: Provide calculations to verify that adequate ventilation will be provided for the occupied spaces (including the office, existing prep, back of house). Reference: Section 403.3.1.1, IMC 2018.] | ||
| 09/08/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. The note specifying the location of the proposed reduced pressure backflow preventer for the misting system does not provide the size of the backflow preventer, the installation clearances, or accessibility information from the manufacturer. [Initial comment: Show the location of the reduced pressure backflow preventer that serves the misting system. Verify that the unit is accessible, based on the manufacturer’s listing information. Reference: Section 303.2, IPC 2018.] 2. Revise detail 2/P2.00 to show the gas shutoff valves located upstream of the sediment trap and to show how the proposed hot water recirculation loop is configured (e.g., circulation pump, check valves, and isolating valves). Reference: Section 408.4, IFGC 2018 and Section 107.2.1, IBC 2018. [Initial comment: Provide a detail showing how the two tankless water heaters are piped in parallel. Reference: Section 303.2, IPC 2018.] 3. Why is there no water distribution to the new bar? Reference: Section 107.2.1, IBC 2018. |
||
| 09/03/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-0625-01192 Location: 2617 N 1ST AV Review Date: 9/3/2025 Site Engineering Comments: 1. Site Engineering will be unable to review and approve permit TC-COM-0625-01192 until the associated development package TD-DEV-0223-00128 is reviewed and approved by all reviewers. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 09/08/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Jeffrey W. Cassidy, Planner Planning & Development Services Department – Current Zoning Review Section PROJECT: TC-COM-0625-01192– Commercial – The scope of work includes a new exterior patio at the east end of the property. There will also be an expansion to the west end of the building to add new ADA compliant women’s restrooms and a small back of house space. The existing remaining restroom will be reconfigured for ADA compliance. 2617 N 1st Av Tucson, AZ 85719 (C-3 Zoning) Development Package Review – 2nd Review TRANSMITTAL DATE: September 09, 2025 1. COMMENT: Zoning will be unable to review and approve permit TC-COM-0625-01192 until the associated development package TD-DEV-0223-00128 is reviewed and approved by all reviewers. If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
| 08/15/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |