Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0625-01144
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/13/2025 | Commercial Electrical Standard | APPROVED | |||
| 07/02/2025 | Site Zoning Standard | APPROVED | |||
| 07/02/2025 | Water - PDSD Standard | APPROVED | |||
| 06/13/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 06/26/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 07/02/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/27/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. Please amend the plans to show the required 60” turning space within the Mother’s room #107. 2009 ICC A117.1 801 & 304.3 2. Please amend the plans to indicate the breakroom work surface and sink are accessible, and please show a forward or parallel approach. 2009 ICC A117.1 804.3 & 804.4 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 07/02/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Revise the sequence of operation for the restroom exhaust fan so that all the air supplied to the restrooms will be exhausted (i.e. all the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2018. |
||
| 07/02/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide a metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10 seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018 and C404.5, IECC 2018. 3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018 (e.g., 24” for a ½” supply, 6” for a ¾” supply). |
||
| 06/12/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/12/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |