Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0624-01275
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/17/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/17/2024 | Special Inspection Certificate Review (Deferred Submittal) | REQUIRES RESUBMIT | Structural Sheet S0.3 requires the following (Please add this to your list of special inspections onto your Special Inspection Certificate form: FABRICATOR SPECAIL INSPECTION): 1704.2.5 SPECIAL INSPECTION OF FABRICATORS: SPECIAL INSPECTION OF FABRICATION OF STRUCTURAL STEEL BEING PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP IS REQUIRED. EXCEPTION: SPECIAL INSPECTIONS OF FABRICATORS WITH ONE OF THE FOLLOWING QUALIFICATIONS IS NOT REQUIRED: • INTERNATIONAL ACCREDITATION SERVICE, INC. (IAS) APPROVED FABRICATOR. • AISC CERTIFIED FABRICATOR (STD). THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT PROVIDE A BASIS FOR INSPECTION CONTROL OF THE WORKMANSHIP AND THE FABRICATOR’S ABILITY TO CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS. THE SPECIAL INSPECTOR SHALL REVIEW THE PROCEDURES FOR COMPLETENESS AND ADEQUACY RELATIVE TO THE CODE REQUIREMENTS FOR THE FABRICATOR’S SCOPE OF WORK. |
||
12/12/2024 | PDSD Application Completeness | REVIEW COMPLETED |