Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0624-01242
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/10/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
02/10/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0624-01241 ADDRESS/PARCEL: (7355 S WILMOT RD TUCSON, AZ 85756) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Special inspection field report required for concrete testing. 2. Please resubmit. |
||
02/10/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | SPECIAL MOMENT RESISTING FRAMES- ACTIVITY NO. TC-COM-0624-01241 ADDRESS/PARCEL: (7355 S WILMOT RD TUCSON, AZ 85756) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Special inspection field report required for special moment resisting frames. 2. Please resubmit. |
||
02/10/2025 | Site Prep Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0624-01241 ADDRESS/PARCEL: (7355 S WILMOT RD TUCSON, AZ 85756) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Special inspection field report required for site prep. 2. Please resubmit. |
||
02/10/2025 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | Foundation Reinforcing | ||
02/10/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
02/10/2025 | Welding Inspection (Deferred Submittal) Express | REVIEW COMPLETED |