Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESTAMP - COMMERCIAL v.1
Permit Number - TC-COM-0624-01215
Review Name: RESTAMP - COMMERCIAL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/11/2025 | Commercial Electrical Express | APPROVED | |||
02/12/2025 | Commercial Mechanical Express | APPROVED | |||
02/12/2025 | Site Engineering Express | APPROVED | |||
02/13/2025 | Site Zoning Express | APPROVED | |||
02/13/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
02/12/2025 | Commercial Plumbing Express | REQUIRES RESUBMIT | Drawing P-2 is not the same as the previously approved drawing. The submitted drawing shows incorrect connected gas loads or input ratings for each appliance. The AC units are scheduled with a gas input of 158.4 MBH but the Gas Diagram, A/P-2, shows a 150 MBH gas input for each unit and a total of 318 MBH and the Gas Meter Load shows a gas input of 159 MBH for each unit. Reference: Section 402.1, IFGC 2018. | ||
02/11/2025 | Fire New Construction Express | REVIEW COMPLETED |