Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0624-01211
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/01/2024 | Commercial Structural | APPROVED | Master Set of Plans on TC-COM-0524-00992 with reviews to be copied on TC-COM-0624-01209, TC-COM-0624-01210, TC-COM-0624-01211, TC-COM-0624-01212 | ||
07/24/2024 | Site Zoning | APPROVED | Master Set of Plans on TC-COM-0524-00992 with reviews to be copied on TC-COM-0624-01209, TC-COM-0624-01210, TC-COM-0624-01211, TC-COM-0624-01212 | ||
07/31/2024 | Fire New Construction | NOT REQUIRED | Master Set of Plans on TC-COM-0524-00992 with reviews to be copied on TC-COM-0624-01209, TC-COM-0624-01210, TC-COM-0624-01211, TC-COM-0624-01212 | ||
08/01/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | Master Set of Plans on TC-COM-0524-00992 with reviews to be copied on TC-COM-0624-01209, TC-COM-0624-01210, TC-COM-0624-01211, TC-COM-0624-01212 | ||
07/31/2024 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Mike Ortiz michael.ortiz@tucsonaz.gov |
||
06/26/2024 | PDSD Application Completeness | REVIEW COMPLETED |