Permit Number: TC-COM-0624-01168
Parcel: 13414002J

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0624-01168
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/17/2024 Commercial Electrical APPROVED
07/26/2024 Commercial Structural APPROVED
07/15/2024 Site Zoning APPROVED
07/24/2024 Site Engineering NOT REQUIRED
07/26/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/23/2024 Commercial Mechanical REQUIRES RESUBMIT 1. Show the complete specifications for each air conditioner system, including the SEER2 for each system, and the heating capacity, Reference: Section R103.2, IECC 2018.
2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections R302.2, R403.7, and R503.1.2, IECC 2018 as amended by the City of Tucson.
3. Provide a programmable thermostat for each air handler that complies with the requirements of Section R403.1.1, IECC 2018.
4. Provide mechanical ventilation for the apartment. Reference: Section R403.6, IECC 2018.
07/23/2024 Commercial Plumbing REQUIRES RESUBMIT Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018
06/21/2024 Fire New Construction REVIEW COMPLETED
06/20/2024 PDSD Application Completeness Express REVIEW COMPLETED