Permit Number: TC-COM-0624-01147
Parcel: 132131290

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0624-01147
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/04/2025 Commercial Building Standard APPROVED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 3/2/2025 7:03:26 PM

Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 2/26/2025 11:04:42 AM
04/01/2025 Site Engineering Standard APPROVED
03/14/2025 Site Zoning Standard APPROVED
03/17/2025 Water - PDSD Standard APPROVED
04/01/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/04/2025 Commercial Electrical Standard REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 2/25/2025 1:21:17 PM
1. E3.2 ELECTRICAL POWER PLAN - ROOF PLAN: Conductors for RTU-8, RTU-10, RTU-13, RTU-17, RTU-18, and RTU19 shall be increased from #8 AWG to #6 AWG to comply with NEC 430.22 base upon 43.3 MCA values shown.
03/04/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 3/4/2025 10:51:09 AM
1. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is
acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements.
2. General - Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate
compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space.
3. Plan Sheet M1.1A - Supply Air Drop CFM for RTU #12 equals 4455 CFM. RTU Schedule states, total CFM for
RTU#12 is 5000. Confirm CFM for RTU #12. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents.
4. Plan Sheet M1.1C - Supply Air Drop CFM for RTU #5 equals 600 CFM. RTU Schedule states, total CFM for RTU#5 is 1200. Confirm CFM for RTU #5. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents.
03/04/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 3/4/2025 1:12:34 AM
Revised Plan Plumbing Review:
1). Plan Page 3.0 riser details 6 & 7: Missing the P9 Bottle Filling station that is shown on plan page P1.2 details 1 & 2.....
Add the P9 Bottle Filling station to the water & sanitary risers. -2018 IPC 106.3.1
2). Plan Page P0.1 & P2.0: The 10666.51 roof section roof drain conductor slope or pipe size is incorrect. The horizontal
sections will need 1/4" pitch or pipe size increased to 8"..... -2018 IPC 1106.2
03/04/2025 Outdoor Lighting Standard REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 2/25/2025 1:21:17 PM
1. E3.2 ELECTRICAL POWER PLAN - ROOF PLAN: Conductors for RTU-8, RTU-10, RTU-13, RTU-17, RTU-18, and RTU19 shall be increased from #8 AWG to #6 AWG to comply with NEC 430.22 base upon 43.3 MCA values shown.
03/10/2025 Fire New Construction Standard REVIEW COMPLETED
02/24/2025 PDSD Application Completeness Express REVIEW COMPLETED