Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0624-01147
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/04/2025 | Commercial Building Standard | APPROVED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 3/2/2025 7:03:26 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 2/26/2025 11:04:42 AM |
||
04/01/2025 | Site Engineering Standard | APPROVED | |||
03/14/2025 | Site Zoning Standard | APPROVED | |||
03/17/2025 | Water - PDSD Standard | APPROVED | |||
04/01/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
03/04/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 2/25/2025 1:21:17 PM 1. E3.2 ELECTRICAL POWER PLAN - ROOF PLAN: Conductors for RTU-8, RTU-10, RTU-13, RTU-17, RTU-18, and RTU19 shall be increased from #8 AWG to #6 AWG to comply with NEC 430.22 base upon 43.3 MCA values shown. |
||
03/04/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 3/4/2025 10:51:09 AM 1. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements. 2. General - Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space. 3. Plan Sheet M1.1A - Supply Air Drop CFM for RTU #12 equals 4455 CFM. RTU Schedule states, total CFM for RTU#12 is 5000. Confirm CFM for RTU #12. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. 4. Plan Sheet M1.1C - Supply Air Drop CFM for RTU #5 equals 600 CFM. RTU Schedule states, total CFM for RTU#5 is 1200. Confirm CFM for RTU #5. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. |
||
03/04/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 3/4/2025 1:12:34 AM Revised Plan Plumbing Review: 1). Plan Page 3.0 riser details 6 & 7: Missing the P9 Bottle Filling station that is shown on plan page P1.2 details 1 & 2..... Add the P9 Bottle Filling station to the water & sanitary risers. -2018 IPC 106.3.1 2). Plan Page P0.1 & P2.0: The 10666.51 roof section roof drain conductor slope or pipe size is incorrect. The horizontal sections will need 1/4" pitch or pipe size increased to 8"..... -2018 IPC 1106.2 |
||
03/04/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 2/25/2025 1:21:17 PM 1. E3.2 ELECTRICAL POWER PLAN - ROOF PLAN: Conductors for RTU-8, RTU-10, RTU-13, RTU-17, RTU-18, and RTU19 shall be increased from #8 AWG to #6 AWG to comply with NEC 430.22 base upon 43.3 MCA values shown. |
||
03/10/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
02/24/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |