Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0624-01130
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/27/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/21/2025 | External Reviewers - Stantec | REQUIRES RESUBMIT | May 21, 2025 3rd Review Medmar Tanque Verde Attn: Aari Ruben 8060 E. 22nd Street Tucson, Arizona 85710 Re: SOIL, SUN, AND LOVE MARKET AND CAFE TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0624-01130 Stantec Project Number: 185215066 Stantec File Number: TUC-24-061 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms M III-B 10,151 310 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, and kitchen hood suppression system. Deferred Submittals: Type I kitchen hood and type 2 kitchen hood Special Inspections: Wood roof strengthening. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. New Comment: The special inspection certificate included with the 3rd submittal is missing the signature of the owner or legal agent. The special inspection certificate in the second submittal did include this signature. Please upload the special inspection certificate with the required signature. Please also be sure to reupload all other documentation (i.e. construction plans, structural calculations and mechanical calculations.) with the next submittal to ensure approval. Sheet A2 1. Addressed. Sheet A3 1. Addressed. Sheet A6 1. Addressed. STRUCTURAL COMMENTS Sheet S2 1. Addressed. MECHANICAL COMMENTS Sheet M1 1. Addressed. 2. Addressed. 3. Addressed. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 05/27/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 05/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |