Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0624-01097
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/24/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/24/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 7/24/2024 12:49:40 PM 1. (RESOLVED) - General - Provide Ventilation Calculation/Schedule - 2018 IMC section 403 Table 403.3.1.1 - ASHRAE 62.1. 2. (UNRESOLVED) - General - Provide COMcheck Mechanical Compliance Certificate - 2015 IECC Section C403.3.2 HVAC equipment performance requirements. i. Submitted COMcheck Mechanical Compliance Certificate does not match for RTUs #1 thru #9. RTU. All (9) unit Tags on Plan Sheet are 5 ton units with 2000 CFM. COMcheck states (8) 10 ton units and (1) 3 ton unit. Confirm unit specifications and make corrections. - 2015 IECC Section C403.3.2 HVAC equipment performance requirements. 3. (UNRESOLVED) - General - Provide Energy Heat Load Calculations - 2015 IECC Section C403.2.1 Calculation of heating and cooling loads. i. Heat Loads not submitted for review. - 2015 IECC Section C403.2.1 Calculation of heating and cooling loads. 4. (UNRESOLVED) - Plan Sheet M1 - RTU identification, adjacent to each RTU does not match the RTU Heating and Cooling Schedule (CFM)- 2018 IECC Section C103.2Information on construction documents. - 2018 IBC – Section [A]107.2.1Information on construction documents i. Plan Sheet M-1.1A - The RTU Heating and Cooling Schedule states (8) 10 ton units with 4000 CFM of supply air and (1) 5 ton unit with 2000 CFM of supply air. This does not match the Unit Tags on Plan Sheet M-1.0. Confirm unit sizes and make corrections to the construction documents. |
||
| 07/19/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |