Permit Number: TC-COM-0624-01097
Parcel: 121060070

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0624-01097
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/28/2024 Site Zoning APPROVED
07/16/2024 Water - PDSD APPROVED
07/08/2024 Site Engineering NOT REQUIRED
07/16/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/24/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 6/22/2024 7:51:07 PM
1. FIRM REGISTRATION: Per the Arizona Revised Statutes, Chapter 32, Rule 141, a firm shall not engage in the practice of any board-regulated profession or occupation unless the firm is registered with the board”. The construction documents must indicate the name and registration number of the engineering firm by which the signing engineer is employed. Please note that engineers acting as a sole practitioner / DBA are not exempt from this statute. Construction documents must be updated to comply with this provision. Refer to the Arizona State Board of Technical Registration (https://btr.az.gov/public/registered-firm-branch-search) for more information.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Denied
Reason:
Date Completed : 6/19/2024 11:23:00 AM
1. Sheet A-0: The occupant load for the break room has not been calculated. While it's true that this space is an accessory use, the occupant load would still need to be calculated. Provide an occupant load calculation for the break room in accordance with 2018 IBC Table 1004.5.






Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 6/21/2024 12:45:36 PM
1. General - Provide Ventilation Calculation/Schedule - 2018 IMC section 403 Table 403.3.1.1 - ASHRAE 62.1.

2. General - Provide COMcheck Mechanical Compliance Certificate - 2015 IECC Section C403.3.2 HVAC equipment
performance requirements.

3. General - Provide Energy Heat Load Calculations - 2015 IECC Section C403.2.1 Calculation of heating and cooling loads.

4. Plan Sheet M1 - RTU identification, adjacent to each RTU does not match the RTU Heating and Cooling Schedule (CFM)- 2018 IECC Section C103.2Information on construction documents. - 2018 IBC – Section [A]107.2.1Information
on construction documents





Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 6/13/2024 12:33:17 PM
1. On sheet E1, drawing elements are under the general notes in two locations.

2. On sheet E2, Detail 1 has numerous Keynotes without any descriptions. Should clarify or provide descriptions.

3. On sheet E4 the city of Tucson requires a short circuit/fault current calculation to each new panel. Provide fault current calculation (preferred option) or can call out fuse type to be used and provide current interrupting graph for selected fuses (allowed by this reviewer, since all panels are fuse protected). Tucson has this requirement to confirm selected panels have properly selected KAIC values for newly installed panels.
07/01/2024 Fire New Construction REVIEW COMPLETED
06/10/2024 PDSD Application Completeness Express REVIEW COMPLETED