Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0624-01088
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/03/2024 | Commercial Electrical | APPROVED | |||
| 07/09/2024 | Commercial Structural | APPROVED | |||
| 06/27/2024 | Site Zoning | APPROVED | |||
| 07/11/2024 | Water - PDSD | NOT REQUIRED | |||
| 07/11/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/11/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. The specified 2-ton rooftop heat pump appears to have a cooling capacity of 40,000 BTUH but the heating/cooling load calculations indicate a total cooling load of 28,983 BTUH and a heating load of 28,839 BTUH. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections R302.2, R403.7, and R503.1.2, IECC 2018 as amended by the City of Tucson. 2. Current Federal Regulations require residential packaged heat pumps to have a minimum SEER of 14 (SEER2 13.4) and a minimum HSPF of 8 (HSPF2 6.7). Show the complete specifications for each packaged heat pump, including the SEER2and HSPF2 for the heat pump and any supplemental heaters. Reference: Sections R103.2, R403.7 and R501.5, IECC 2018. 3. The air balancing information for each heat pump shows a total airflow rate of only 340 CFM (a 2-ton heat pump typically delivers 400 CFM). Show that the equipment is being installed in accordance with the conditions of its listing and the manufacturer’s installation requirements. Reference: Section 304.1, IMC 2018. 4. Provide service platforms and guards for roof mounted equipment. Reference: Section 306.5.1 IMC 2018. 5. Condensate drains may not terminate at or over a plumbing vent. Condensate drains shall be terminated at an approved disposal location. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson and Section 901.4, IPC 2018. 6. Verify that the partition containing the dryer vent is constructed with 2” x 6” studs (wall type 3 is not defined). Revise the depiction of the dryer vent on MP1.0 to show a 4” diameter vent, not a rectangular vent. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018. |
||
| 07/11/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Show the locations of the water service entrance to the duplex. Provide a full-open valve for the water supply entrance to each dwelling unit unless each fixture is equipped with stop valves. Reference: Section 606.1(6), IPC 2018. 2. Clarify the natural gas distribution to both units of the duplex. Show the appliance loads, the pipe sizes, and the developed pipe length from the meter to each gas-fire appliance. Reference: Section 107.2.1, IBC 2018 and Sections 402.1 and 402.3, IFGC 2018. 3. Provide the specifications and listing information for the proposed water heaters. Reference: Sections 303.2 and 501.5, IPC 2018 and Section 107.2.1, IBC 2018. 4. Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018. 5. Provide details showing how the floor of the shower is to be constructed in accordance with the requirements of 421.5, IPC 2018. 6. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, , 606.1, and 607.3, IPC 2018. |
||
| 07/02/2024 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Mike Ortiz michael.ortiz@tucsonaz.gov |
||
| 06/07/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 06/06/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |