Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0623-01596
Parcel: 132131330

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0623-01596
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/30/2023 Site Engineering APPROVED
09/21/2023 Water - PDSD APPROVED
09/21/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
09/05/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 9/5/2023 8:49:12 AM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall
not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 8/24/2023 1:45:34 PM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 7/1/2023 7:47:12 PM
Approved/Subject to field approval




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 8/25/2023 9:45:02 AM
2nd Electrical Review of Freddy’s
By: Ron Ross PE
Approved as submitted.




Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 8/29/2023 9:49:54 PM
Second Plumbing Review: outstanding comments 1, 2, 6
1). Unresolved-Plan page A5 needs to include scupper & downspout sizing calculations. -IPC 1106.1, 1106.3, 1106.5 ** No response**

2). Unresolved-Plan page A5 needs to include secondary scupper locations & detail. -IPC 1106.5, 1108** No response**

3). Resolved-The 3 comp sink detail on plan page P3 needs to show each bin individually piped to the waste receptor. -IPC 802.1.1

4). Resolved-Add the gas system length & sizing table used to plan page P2 -IFGC 402.4

5). Resolved-Plan submittal needs to be accompanied by the site utility piping plan for the continuation of the sewer & water service. -IPC 106.3.1 as stated on plan pages P1 & P2

6). Now that civil utility plan page 7 has been been provided it doesn't correlate with the grease , sewer & water piping configurations/locations shown on plan pages - P1 & P2 -IPC 106.3.1
08/23/2023 PDSD Application Completeness REVIEW COMPLETED