Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0623-01596
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/11/2023 | Site Zoning | APPROVED | |||
07/27/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
07/17/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0623-01596 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Denied Reason: Date Completed : 7/15/2023 11:59:16 AM 1. Provide Structural Calculations for Foundations and Roof Framing per Section 1601.1 of International Building Code 2018. 2. Provide Wind Load Calculations for the Building per Section 1609 of International Building Code 2018. 3. Provide Seismic Calculations for the Building per Section 1613 of International Building Code 2018. 4. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 5. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 6. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 7. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 1. Provide galvanized bolts on the roof screen framing connections. 2. Roof Steel Joists supporting any additional/point loadings are to be Special Joists. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 7/7/2023 1:24:44 PM 1. General: No egress plans have been provided. Provide thorough egress plans. 2. Sheet A6.2: Detail P indicates the use of 1/2" APA plywood sheathing. However, Type IIB construction does not permit the use of non fire retardant treated wood. Provide a non combustible material in accordance with Section 603.1. 3. Sheet A6.2: Detail M indicates the use of 5/8" plywood sheathing. However, Type IIB construction does not permit the use of non fire retardant treated wood. Provide a non combustible material in accordance with Section 603.1. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Approved with Comments Reason: Date Completed : 7/1/2023 7:47:12 PM Approved/Subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 7/6/2023 11:25:43 AM Electrical Review of Freddy’s By: Ron Ross PE ES-1: Could not locate Plan Note #7. E-1: Need to provide weather proof GFI service receptacles within 25 feet of exterior HVAC equipment on North side of building per NEC 210.63. Could not locate Power Note 25. E-1.1: Need to provide weather proof GFI service receptacles within 25 feet of all exterior HVAC/RTU equipment whether on the ground or on the roof per NEC 210.63 ie Condensing units on the NE corner may need a WP GFI receptacle. E-2: Could not locate Lighting Note 3. No description for Lighting Note 8. E-3: No description for Lighting Note 27. E-4: Panel A is called out as MLO panel on Engraved Placard. This is an NEC violation as there is no protection on the feeders from the disconnect to the panels. Either provide an MDP in place of Service Disconnect, comply with Tap rule (provide an MCB in panels A, B, and C to comply with NEC 240.21), or upsize panels and conductors to rating of the service Fused Disconnect (NEC 240.2). E-5: Tucson City requires Short Circuit calculations for all panels. Provide calculation. The source current is typically obtained from the local utility tables made available by the local utility provider or you can estimate Short circuit available at transformer based upon the largest transformer that would be requested for the site. Where Short circuit values fall below 5,000 amps, no further downstream calculations are required. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 7/11/2023 10:23:18 PM First Plumbing Review: 1). Plan page A5 needs to include scupper & downspout sizing calculations. -IPC 1106.1, 1106.3, 1106.5 2). Plan page A5 needs to include secondary scupper locations & detail. -IPC 1106.5, 1108 3). The 3 comp sink detail on plan page P3 needs to show each bin individually piped to the waste receptor. -IPC 802.1.1 4). Add the gas system length & sizing table used to plan page P2 -IFGC 402.4 5). Plan submittal needs to be accompanied by the site utility piping plan for the continuation of the sewer & water service. - IPC 106.3.1 as stated on plan pages P1 & P2 |
||
07/10/2023 | Site Engineering | REQUIRES RESUBMIT | 1. The scupper locations on the architectural site plan on page on SA1 do not match the scupper locations on the approved development package site plan. Please ensure that these match. 2. Show locations of drainage downspouts on the roof plan. Lianne Evans lianne.evans@tucsonaz.gov |
||
07/27/2023 | Water - PDSD | REQUIRES RESUBMIT | Show the location of the proposed water meter, backflow preventer, and the water service pipe on a civil site plan, as noted on sheet P2. Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018. | ||
07/13/2023 | Fire New Construction | REVIEW COMPLETED | Separate permits required for: * Hood suppression system * CO2 gas detection if applicable (>100lbs) Operational permit required if CO2 detection is applicable. |
||
06/29/2023 | PDSD Application Completeness | REVIEW COMPLETED |