Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0623-01578
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/13/2023 | Site Zoning | APPROVED | |||
09/13/2023 | Site Engineering | NOT REQUIRED | |||
09/13/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/05/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 9/2/2023 8:29:09 AM 1) Sheet A1.0 – Provide structural scope of this permit. New wall details are provided in A11.0 but A4.0 does not clarify locations of new walls. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 9/2/2023 8:30:16 AM 1) Sheet A1.0 – Provide clear scope of work of this permit. ADA restroom details are provided in A9.0 but no clear plumbing scope. New wall details are provided in A11.0 but A4.0 does not clarify locations of new walls. Ceiling plan is provided in A5.0 with 4 x 8 vinyl ceiling tiles but light fixtures are unclear. 2) Sheet A1.0 – Is the building construction type V-B or V-A? 3) Sheet A1.0 – Are there fire alarm system modification? 4) Sheet A3.0 – Show exit travel distance and common path of travel according to 2018 International Building Code chapter 10. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 9/2/2023 8:29:41 AM 1) Sheet A1.0 – Provide mechanical scope of this permit. Is there modification of existing mechanical system? Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 9/2/2023 8:29:58 AM 1) Sheet A1.0 – Provide electrical scope of this permit. Are there modifications in existing light fixtures? Provide electrical demolition plan if so and show light fixture type(s). Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 9/2/2023 8:29:24 AM 1) Sheet A1.0 – Provide plumbing scope of this permit. ADA restroom details are provided in A9.0 but no clear plumbing scope. 2) Sheet A1.0 – Provide plumbing fixture calculations for both male and female accordance with 2018 International Plumbing Code section 403 including drinking fountain and service sink. Provide exception sections when applicable. |
||
09/07/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/31/2023 | PDSD Application Completeness | REVIEW COMPLETED |