Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0623-01487
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/21/2023 | Site Zoning | APPROVED | |||
06/29/2023 | Site Engineering | NOT REQUIRED | |||
06/29/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/22/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0623-01487 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 6/22/2023 8:05:37 AM Structural calculation title shows 145 E. Congress, Tucson, AZ as the address. Are there two separate permits? Sheet S2.0 – Sheet A1 partial demolition plan shows two stairs to be removed but only one stairs addressed in structural plan. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 6/22/2023 8:04:17 AM Sheet C1 – Is fire alarm modification under separate permit? (deferred) Sheet X1 – All rooms should be identified. New basement rooms are not identified and adjacent tenant work unidentified while it’s part of exit access through kitchen area #102 door. Sheet X1 – Provide total building area (SF) and number of stories. Sheet X1 – Basement floor plan does not match with M1 and P1 plans which shows additional rooms. Sheet X1 – Show the dead-end corridor distance in basement floor code analysis plan. Does it meet 2018 IBC 1020.4 Dead ends requirement? Sheet X1 – Show complete basement exit stairs. Only two risers are shown after the landing and coordinate with partial basement lighting plan clarifying the path of egress. Sheet A1 – Provide demolition and new 2nd floor plan. Partial demolition plan shows stairways to be removed but does not show plan above. Sheet S2.0 only shows one stair to be removed so clarify the demolition scope. Clearly show up and down stairway directions. Sheet A1.1 – Show room identifications in partial basement floor plan. A1.1 basement floor plan does not match with S2.0, M1 and P1 plans which shows additional rooms. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 6/22/2023 8:04:50 AM Sheet M1 – Mechanical basement floor plan does not coordinate with X1, A1, A1.1, and S2.0. Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 6/22/2023 8:04:33 AM Sheet E3 – Partial basement lighting plan have new rooms without lighting. Sheet E3 – Basement plan do not coordinate with M1, P1 and P3 room layouts. Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 6/22/2023 8:05:04 AM Sheet P1 and P3 – Plumbing basement floor plan do not coordinate with X1, A1, A1.1, and S2.0. |
||
06/21/2023 | Fire New Construction | REVIEW COMPLETED | |||
06/14/2023 | PDSD Application Completeness | REVIEW COMPLETED |