Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0623-01471
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/30/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/30/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0623-01471 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Denied Reason: Date Completed : 6/29/2023 2:33:46 PM 1. Refer to Structural Drawings and Architectural Drawings. The size and Footprint of the buildings do not match. Revise Structural Drawings Foot Print to match Architectural Drawings. 2. Provide Structural Calculations for Foundations and Foundation Loadings from the Prefab Building per Section 1601.1 of International Building Code 2018. 3. Provide Wind Load Calculations for the Prefab Building per Section 1609 of International Building Code 2018. 4. Provide Seismic Calculations for the Prefab Building per Section 1613 of International Building Code 2018. 5. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 6. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 7. DEFERRED SUBMITTAL REQUIREMENTS Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 6/15/2023 5:40:53 PM 1. Sheet A002:The ancillary area appears to be a business use and thus the occupant load calculations are incorrect. Provide a corrected occupant load calculation or additional clarification as the use of the ancillary area in accordance with the 2018 IBC Table 1004.5. Section 1004.3 requires a space by space occupant load calculation. 2. Sheet A002: Provide additional clarification as to the use of each space. Appropriately label each room. 3. Sheet A002: It appears that a mix use situation is present without any indication as to the mux use strategy being used. Provide clarification and correlation with the applicable mix use requirements of 2018 IBC Section 508. 4. Sheet A101: At least 5% of each type of locker is required to be accessible. Provide the proper number of accessible lockers in accordance with the 2010 ADA Standards Section 222.1. 5. Sheet A101: Benches are required to be provided in lockers rooms that comply with Section 903 (2018 IAC) in accordance with the 2010 ADA Standards Section 803.4. 6. Sheet A104: The RCP does not indicate the location of any egress lighting or exit signage. Provide the location of all egress illumination and exit lighting in accordance with Section 1008 and 1013. 7. Sheet A303: Provide all manufacturer specifications for the fire rated plywood being used for the wainscotting. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Approved with Comments Reason: Date Completed : 6/12/2023 10:33:03 PM Approved /subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 6/22/2023 3:56:04 PM Electrical Review of SAIA LTL Freight By: Ron Ross PE E001 Electrical Symbols and Abbreviations: No electrical issues E002 Electrical Specifications - Sheet #1: No electrical issues E003 Electrical Specifications - Sheet #2: No electrical issues E200A Site Plan - Electrical: No electrical issues EL201A-G SAIA Truck Maintenance Shop - Ground Level - Lighting: No electrical issues EL201B-G SAIA Truck Maintenance Shop - Mezzanine Level - Lighting: No electrical issues EP202A-G SAIA Truck Maintenance Shop - Ground Level - Power: No electrical issues EP202B-G SAIA Truck Maintenance Shop - Mezzanine Level - Power: No electrical issues E501 Electrical Detail Sheet #1: Detail 7 should show ground rod more clearly as it currently appears to be an elongated Anchor Bolt. E502 Electrical Detail Sheet #2: No electrical issues E503 Electrical Detail Sheet #3: Generator Circuit breaker is too large for 150 KW generator ie generator will not even start or will shut down if overloaded vs tripping out CB. CB may have been sized for a 208/120V 150 KW generator. E504 Electrical Detail Sheet #4: No electrical issues E505 Electrical Panel Schedules: No electrical issues E506 Electrical Panel Schedules: Confirm load calculation for RP2. Doesn’t seem to accurately reflect subpanel loading from RP4 and RP5. May not be an issue, but needs to be rechecked. E507 Lighting Schedule: Need to provide an interior lighting Comcheck and a required exterior lighting Tucson city Lumens calculation. The first is to prove IECC compliance, the Lumens calculation is a Tucson requirement. E601 Electrical One Line Diagram: Generator Circuit breaker is too large for 150 KW 480/277V generator ie generator might not start or will shut down if overloaded vs tripping out CB. If it is an adjustable trip, should call out max trip setting for generator. E602 Electrical Feeder Schedule: Feeder #12, 13, 13B, 18, and 18B do not comply with NEC 9 Annex C conduit fill requirements for conduit sizes selected. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 6/25/2023 9:51:32 AM First Plumbing Review: Sala Garage Plan. See warehouse plan under project #TC-COM-0623-01468 1). Add gutter & downspout sizing calculations to plan page A105 -IPC 1106.1, 1106.3, 1106.6 2). Plan set needs to be accompanied by a site utility for the continuation of sanitary, water, fire line, & gas.as stated throughout plumbing pages -IPC 106.3.1 3). Detail #6 on plan page P503 states water heater DWH-2 utilizes propane, but plan page P504 states water heater DWH-2 Utilizes Natural Gas ? Plan pages need to correlate. -IFGC 106.3.1/NFPA58 4). Plan pages P202B-G, P203 show LP Gas system but plan page P504 states water heater DWH-2 Utilizes Natural Gas ? Plan pages need to correlate. -IFGC 106.3.1/NFPA58 5). Plan page P504 fixture schedules needs to include high/low drinking fountain manufacturer & model number - IPC 410.1 6). Trench drain connections on plan page P601G need traps -IPC IPC 1002.1 7). Gas plan page P202B-G needs to illustrate the LP Tank location. -NFPA58 8). Gas piping plan page P202B-g needs to included gas system length & sizing table used -IFGC 402.4 9). Plan page P003 needs to include LP tank info such as above or underground type & size. -NFPA58 10). Gas plans need to include an LP tank detail that includes tank anchoring methods. -NFPA58 11). Label The emergency eyewash/shower mixing valve location plan pages P202B-G & P602G , it appears key note symbol #8 on P602G is intended to reflect this info but no correlating notes are included on plan page P602G? -IPC 106.3.1, 411.3 12). Plan page P602G is missing the correlating keynote information. -IPC 106.3.1 13). plumbing plan page P001 sheet list & plan set cover page plumbing plan sheet list don't match. -IPC 106.3.1 14). Plan page P001 sheet list doesn't match plumbing pages sent. -IPC 106.3.1 |
||
06/30/2023 | Fire New Construction | REQUIRES RESUBMIT | Resolve SAFEBuilt comments | ||
06/21/2023 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comment | ||
06/14/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0623-01468 & TC-COM-0623-01471 7157 S. Swan Rd. – I-2 Commercial Storage (1st Review) TRANSMITTAL DATE: June 14, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the I-2 zone (UDC 4.7.30). Commercial Storage is a permitted use in this zone (Table 4.8-5), subject to Use Specific Standards 4.9.10.A and 4.9.13.Q. 1. Until a Development Package meeting the requirements of AM 2-06 is submitted and approved zoning cannot approve this plan. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
06/09/2023 | PDSD Application Completeness | REVIEW COMPLETED |