Permit Number: TC-COM-0623-01471
Parcel: 140398760

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-0623-01471
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/09/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
02/09/2024 Site Engineering REQUIRES RESUBMIT See zoning comment
02/01/2024 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-0623-01468 & TC-COM-0623-01471
7157 S. Swan Rd. – I-2
Transportation Service, Land Carrier (3rd Review)

TRANSMITTAL DATE: February 1, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the I-2 zone (UDC 4.7.30). Transportation Service, Land Carrier is a permitted use in this zone (Table 4.8-5), subject to Use Specific Standards 4.9.13.Q.

1. Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0523-00230 and although the plans appear to match until comment 2 below is addressed and the DP is approved by all review agencies Zoning cannot approve the building plans.

2. This comment was not addressed. Per UDC Article 6.4.4.A Measurement of Building Height, building height is the vertical distance measured from the design grade elevation to the middle (between the eave and ridge ) of the highest gable of a pitched or hipped roof. Provide a dimension from design grade to the midpoint of the pitched roof.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
02/07/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved with Comments
Reason:
Date Completed : 2/5/2024 5:18:14 PM
1. GENERAL - DEFERRED SUBMITTAL REQUIREMENTS: The pre-engineered metal building is understood to be a "deferred submittal" with complete drawings being submitted at a later date. Please note that the 2018 International Building Code, Section 107.3.4.1 requires deferred submittals to be approved by the building official. The IBC further requires the following procedure be followed when permitting deferred submittals:

i. All submittals shall first be reviewed by design professional in responsible charge.

ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.

iii. They shall then be submitted for review by the building official.

iv. No structural elements shall be installed until approved by building official.


Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 9/21/2023 11:01:31 AM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Approved with Comments
Reason:
Date Completed : 6/12/2023 10:33:03 PM
Approved /subject to field approval



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 11/28/2023 9:17:27 AM



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 9/23/2023 7:57:22 PM
Second Plumbing Review: Sala Garage Plan. See warehouse plan under project #TC-COM-0623-01468
OK Subject To Field Inspections
1). Resolved-Add gutter & downspout sizing calculations to plan page A105 -IPC 1106.1, 1106.3, 1106.6

2)..RESOLVED- Plan set needs to be accompanied by a site utility for the continuation of sanitary, water, fire line, & gas.as stated throughout plumbing pages -IPC 106.3.1

3).RESOLVED-Detail #6 on plan page P503 states water heater DWH-2 utilizes propane, but plan page P504 states water heater DWH-2 Utilizes Natural Gas ? Plan pages need to correlate. -IFGC 106.3.1/NFPA58

4). .RESOLVED-Plan pages P202B-G, P203 show LP Gas system but plan page P504 states water heater DWH-2 Utilizes Natural Gas ? Plan pages need to correlate. -IFGC 106.3.1/NFPA58

5). .RESOLVED-Plan page P504 fixture schedules needs to include high/low drinking fountain manufacturer & model number - IPC 410.1

6). .RESOLVED-Trench drain connections on plan page P601G need traps -IPC IPC 1002.1

7). .RESOLVED-Gas plan page P202B-G needs to illustrate the LP Tank location. -NFPA58

8)..RESOLVED-Gas piping plan page P202B-g needs to included gas system length & sizing table used -IFGC 402.4

9). .RESOLVED-Plan page P003 needs to include LP tank info such as above or underground type & size. -NFPA58

10). .RESOLVED-Gas plans need to include an LP tank detail that includes tank anchoring methods. -NFPA58

11)..RESOLVED-Label The emergency eyewash/shower mixing valve location plan pages P202B-G & P602G , it appears key note symbol #8 on P602G is intended to reflect this info but no correlating notes are included on plan page P602G? -IPC
106.3.1, 411.3

12). .RESOLVED-Plan page P602G is missing the correlating keynote information. -IPC 106.3.1

13). .RESOLVED-plumbing plan page P001 sheet list & plan set cover page plumbing plan sheet list don't match. -IPC 106.3.1

14). .RESOLVED-Plan page P001 sheet list doesn't match plumbing pages sent. -IPC 106.3.1
01/17/2024 PDSD Application Completeness REVIEW COMPLETED