Permit Number: TC-COM-0623-01468
Parcel: 140398760

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-0623-01468
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/09/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
02/09/2024 Site Engineering REQUIRES RESUBMIT See zoning comment
02/01/2024 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-0623-01468 & TC-COM-0623-01471
7157 S. Swan Rd. – I-2
Transportation Service, Land Carrier (3rd Review)

TRANSMITTAL DATE: February 1, 2024

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the I-2 zone (UDC 4.7.30). Transportation Service, Land Carrier is a permitted use in this zone (Table 4.8-5), subject to Use Specific Standards 4.9.13.Q.

1. Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0523-00230 and although the plans appear to match until comment 2 below is addressed and the DP is approved by all review agencies Zoning cannot approve the building plans.

2. This comment was not addressed. Per UDC Article 6.4.4.A Measurement of Building Height, building height is the vertical distance measured from the design grade elevation to the middle (between the eave and ridge ) of the highest gable of a pitched or hipped roof. Provide a dimension from design grade to the midpoint of the pitched roof.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
02/06/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved with Comments
Reason:
Date Completed : 2/5/2024 4:52:00 PM
1. GENERAL - DEFERRED SUBMITTAL REQUIREMENTS: The pre-engineered metal building is understood to be a "deferred submittal" with complete drawings being submitted at a later date. Please note that the 2018 International Building Code, Section 107.3.4.1 requires deferred submittals to be approved by the building official. The IBC further requires the following procedure be followed when permitting deferred submittals:

i. All submittals shall first be reviewed by design professional in responsible charge.

ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.

iii. They shall then be submitted for review by the building official.

iv. No structural elements shall be installed until approved by building official.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 9/21/2023 10:53:32 AM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Approved with Comments
Reason:
Date Completed : 6/12/2023 10:23:51 PM
Approved/subject to field approval



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 11/24/2023 11:25:26 AM



Plumbing(P) Reviewer (from previous submittal TUC9295001.112223)
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 11/25/2023 9:13:39 PM
Third Plumbing Review: Sala OFFICE/Warehouse. For Sala Garage see project # TC-COM-0623-01471
OK Subject to Field inspections
1). Resolved-Add gutter & downspout sizing calculations to plan page A105 -IPC 1106.1, 1106.3, 1106.6

2). Resolved-Plan pages P401A & P401B show shop restrooms & a shop breakroom, the location of these areas is not shown on the floor plan pages . Plan pages need to correlate. -IPC 106.3.1 **If on another plan set make that clear on plan page notes**

3). Resolved-Plan pages P401A & P401B show shop restrooms & a shop breakroom, the sanitary & water piping riser diagrams on Plan page P601 don't reflect these areas? Plan pages need to correlate. -IPC 106.3.1 **If on another plan set make that clear on plan page notes**

4). Resolved-Plan page P401A Detail #2 note #9 refers to Page P202A for continuation of Building drain? P202A not included in plan set. plan pages need to correlate -IPC 106.3.1**If on another plan set make that clear on plan page notes**

5). Resolved-Plan page P401B Detail #2 note #19 refers to Page P202B for continuation of water main? P202B not included in plan set. plan pages need to correlate -IPC 106.3.1**If on another plan set make that clear on plan page notes**

6). Resolved-Water heater Exhaust & intake note #7 on plan page P401A directs to plan page P206, Plan page P206 not included in plan set. Plan pages need to correlate -IFGC 106.3.1, 304, 503.1**If on another plan set make that clear on plan
page notes**

7). Resolved-Gas piping continuation note # 27 on plan page P401B directs to plan page P203, Plan page P203 not included in plan set. Plan pages need to correlate -IFGC 106.3.1**If on another plan set make that clear on plan page notes**

8). Resolved-Hose Bibs on plan pages P401B & P601 need shut off valves -IPC 606.2

9). Resolved-Detail #6 on plan page P503 states water heater DWH-2 utilizes propane, but plan page P504 states water heater DWH-2 Utilizes Natural Gas ? Plan pages need to correlate. -IFGC 106.3.1/NFPA58

10). Resolved-Gas systems need to be shown in their entirety along with system legnth, and sizing table used. -IFGC 106.3.1, 402.4, NFPA58**If on another plan set make that clear on plan page notes**

11). Resolved-Required high/low dinking fountain shown on plan pages needs have its manufacturer name & model number reflected on plan page P504 fixture schedule. -IPC 403.1, 410.1, 410.3

12). Resolved-Plan page P003 states Catch basin, trench drain, Emergency shower/eyewash, oil interceptor, LP gas system are part of this project? These items are not reflected within the plumbing pages? Plan pages need to correlate. - IPC 106.3.1**If on another plan set make that clear on plan page notes**

13). Resolved-Plumbing page sheet sheet list on P001 doesn't match the included plumbing pages or the sheet list on the cover plan page . -IPC 106.3.1

14). Resolved-Provide civil plan for continuation of of sewer, water, gas as stated throughout plumbing pages. -IPC 106.3.1

15). Resolved-If high/low drinking fountain is located in another building on same site show accessible route with distances that comply with IPC-403.5 or add High/low drinking fountain or add a water dispenser to this facility ** OFFICE/DOCK
BULIDING NEEDS A HIGH/LOW DRINKING FOUNTAIN OR WATER DISPENSER** ** Subject to Field inspections
01/17/2024 PDSD Application Completeness REVIEW COMPLETED