Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0623-01468
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/30/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/28/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0623-01468 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Denied Reason: Date Completed : 6/28/2023 1:51:23 PM 1. Provide Structural Calculations for Foundations and Foundation Loadings from the Prefab Building per Section 1601.1 of International Building Code 2018. 2. Provide Wind Load Calculations for the Prefab Building per Section 1609 of International Building Code 2018. 3. Provide Seismic Calculations for the Prefab Building per Section 1613 of International Building Code 2018. 4. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 5. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 6. DEFERRED SUBMITTAL REQUIREMENTS Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 6/26/2023 12:09:59 PM 1. Sheet A002: The egress plans is not complete and falls off the edge of the page. Provide a properly scaled egress plan. 2. Sheet A002: The numbers provided for the allowable area are incorrect. The numbers provided are for a nonsprinklered buildings. Please provide the corrected allowable area numbers in accordance with Table 506.2. 3. Sheet A002: The training room is a assembly use and the occupant load must be calculated as such. There is a distinct difference between occupancy classification and occupancy use. The exceptions provided in Section 303.1.2 apply to that of classification and the requirements of max. allowable area, height, stories, mix-use requirements and overall classification of the building. However, when calculating occupant loads, one must calculate based on the use of the space. Provide a space by space occupant load calculation in accordance with Section 1004 and Table 1004.5. 4. General: No site plan has been provided. Provide an architectural site plan. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Conditionally Approved Reason: Date Completed : 6/12/2023 10:23:51 PM Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 6/22/2023 10:41:54 AM Electrical Review for Dock Permit By: Ron Ross PE E501 Electrical Detail Sheet #1: Ground Rod not clearly detailed in detail 7. E503 Electrical Detail Sheet #3: Generator Circuit breaker is too large for 150 KW generator ie generator will not even start or will shut down if overloaded vs tripping out CB. CB may have been sized for a 208/120V 150 KW generator. E506 Electrical Panel Schedules: Confirm load calculation for RP2. Doesn’t seem to accurately reflect subpanel loading from RP4 and RP5. May not be an issue, but needs to be rechecked. E507 Lighting Schedule: Need to provide an interior lighting Comcheck and a required exterior lighting Tucson city Lumens calculation. The first is to prove IECC compliance, the Lumens calculation is a Tucson requirement. E601 Electrical One Line Diagram: Generator Circuit breaker is too large for 150 KW 480/277V generator ie generator might not start or will shut down if overloaded vs tripping out CB. If it is an adjustable trip, should call out max trip setting for generator. E602 Electrical Feeder Schedule: Feeder #12, 13, 13B, 18, and 18B do not comply with NEC 9 Annex C conduit fill requirements for conduit sizes selected. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 6/25/2023 12:33:41 AM First Plumbing Review: Sala Warehouse. For Sala Garage see project # TC-COM-0623-01471 1). Add gutter & downspout sizing calculations to plan page A105 -IPC 1106.1, 1106.3, 1106.6 2). Plan pages P401A & P401B show shop restrooms & a shop breakroom, the location of these areas is not shown on the floor plan pages . Plan pages need to correlate. -IPC 106.3.1 **If on another plan set make that clear on plan page notes** 3). Plan pages P401A & P401B show shop restrooms & a shop breakroom, the sanitary & water piping riser diagrams on Plan page P601 don't reflect these areas? Plan pages need to correlate. -IPC 106.3.1 **If on another plan set make that clear on plan page notes** 4). Plan page P401A Detail #2 note #9 refers to Page P202A for continuation of Building drain? P202A not included in plan set. plan pages need to correlate -IPC 106.3.1**If on another plan set make that clear on plan page notes** 5). Plan page P401B Detail #2 note #19 refers to Page P202B for continuation of water main? P202B not included in plan set. plan pages need to correlate -IPC 106.3.1**If on another plan set make that clear on plan page notes** 6). Water heater Exhaust & intake note #7 on plan page P401A directs to plan page P206, Plan page P206 not included in plan set. Plan pages need to correlate -IFGC 106.3.1, 304, 503.1**If on another plan set make that clear on plan page notes** 7). Gas piping continuation note # 27 on plan page P401B directs to plan page P203, Plan page P203 not included in plan set. Plan pages need to correlate -IFGC 106.3.1**If on another plan set make that clear on plan page notes** 8). Hose Bibs on plan pages P401B & P601 need shut off valves -IPC 606.2 9). Detail #6 on plan page P503 states water heater DWH-2 utilizes propane, but plan page P504 states water heater DWH-2 Utilizes Natural Gas ? Plan pages need to correlate. -IFGC 106.3.1/NFPA58 10). Gas systems need to be shown in their entirety along with system legnth, and sizing table used. -IFGC 106.3.1, 402.4, NFPA58**If on another plan set make that clear on plan page notes** 11). Required high/low dinking fountain shown on plan pages needs have its manufacturer name & model number reflected on plan page P504 fixture schedule. -IPC 403.1, 410.1, 410.3 12). Plan page P003 states Catch basin, trench drain, Emergency shower/eyewash, oil interceptor, LP gas system are part of this project? These items are not reflected within the plumbing pages? Plan pages need to correlate. - IPC 106.3.1**If on another plan set make that clear on plan page notes** 13). Plumbing page sheet sheet list on P001 doesn't match the included plumbing pages or the sheet list on the cover plan page . -IPC 106.3.1 14). Provide civil plan for continuation of of sewer, water, gas as stated throughout plumbing pages. -IPC 106.3.1 15). If high/low drinking fountain is located in another building on same site show accessible route with distances that comply with IPC-403.5 or add High/low drinking fountain or add a water dispenser to this facility |
||
06/30/2023 | Fire New Construction | REQUIRES RESUBMIT | Resolve SAFEBuilt comments | ||
06/21/2023 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comment | ||
06/14/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0623-01468 7157 S. Swan Rd. – I-2 Commercial Storage (1st Review) TRANSMITTAL DATE: June 14, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the I-2 zone (UDC 4.7.30). Commercial Storage is a permitted use in this zone (Table 4.8-5), subject to Use Specific Standards 4.9.10.A and 4.9.13.Q. 1. Until a Development Package meeting the requirements of AM 2-06 is submitted and approved zoning cannot approve this plan. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
06/09/2023 | PDSD Application Completeness | REVIEW COMPLETED |