Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0623-01457
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/15/2023 | Site Zoning | APPROVED | |||
| 06/16/2023 | Site Engineering | NOT REQUIRED | |||
| 07/03/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/03/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0623-01457 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Janet Matz jmatz@safebuilt.com Conditionally Approved Reason: Date Completed : 7/2/2023 12:52:17 AM no structural work was included in this submittal Building(B) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 7/2/2023 12:51:26 AM 1. Update the list of applicable codes to include the 2018 International Fuel Gas Code. 2. Add sheet A503 to the index on sheet G001 or remove it from the set. 3. Remove the “delivery drop zone” designation in front of the electrical panels on the life safety plan sheet G002. This area is part of the clear working space for the electrical panels as required in the 2017 NEC section 110.26 and can not be used for storage, even temporarily. Mechanical(M) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 7/2/2023 12:51:47 AM Electrical(E) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 7/2/2023 12:51:37 AM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 7/1/2023 1:55:37 AM First Plumbing Review: 1). Plumbing Fixture calculations pending Building plan review of occupancy load and type. -IPC 403.1 2). Plan Page A103 states water heater is gas, plan page P-601 states water heater is electric? Plan pages need to correlate -IPC 106.3.1 3). Plan page P-103 roof condensate can't discharge to roof surface, will need to be routed to a receptor -IPC 314.2.1 |
||
| 06/15/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 06/14/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |