Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.2
Permit Number - TC-COM-0623-01432
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/10/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/10/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 The electrical line diagrams show both services connected to Utility transformers? Previous review comment # 2. (a) Why does suite 111 show new panel labeled 109B? (b) Why does suite 105 show existing panel 101, etc, etc.? Per the previous plan review comments. Please re-check all panels and locations and correlate with the line diagrams and suite numbers. 2 For clarity, please provide a detailed narrative or sequence of events to take place when the new electrical service (SES1 or SES2) ? Whatever its going to be called, and clarify the desired ending result. Perhaps provide a before and after electrical plan instead of trying to incorporate both on one plan sheet. Please provide this information as a plan document to aid the building inspectors during field inspections. Ref 2018 IBC section 107.2.1, 2017 NEC. |
||
08/04/2023 | PDSD Application Completeness | REVIEW COMPLETED |