Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0526-00731
Parcel: 305230070

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0526-00731
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/05/2026 Commercial Building Standard APPROVED NOTE: Structural Engineer Alex Lane Firth indicates signing his seal on 2/25/26. However, his signature is now showing with the seal. Please ensure that his signature appears on his seal.
06/10/2026 Commercial Plumbing Standard APPROVED
06/02/2026 Site Engineering Standard APPROVED
06/10/2026 Site Zoning Standard NOT REQUIRED Property is located outside City of Tucson jurisdiction. Site Zoning review not required.
06/10/2026 Water - PDSD Standard NOT REQUIRED
06/10/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/04/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0526-00731 (15850 S HOUGHTON RD VAIL, AZ 85641)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Electrical Engineer of Record’s (EEOR) Seal is missing from sheet E-100.
2. EEOR’s Seal is covering key notes, calculations or other information on several electrical sheets. Please place Seal such that it does not cover any of the information needed for review.
06/10/2026 Commercial Mechanical Standard REQUIRES RESUBMIT The roof of the new control building shall comply to the solar reflectance and thermal emittance requirements of Section C402.3, IECC 2018. Reference: Section C402.1.2, IECC 2018.
06/04/2026 Outdoor Lighting Standard REQUIRES RESUBMIT Outdoor Lighting Review TC-COM-0526-00731 (15850 S HOUGHTON RD VAIL, AZ 85641)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Update outdoor lighting lumen calculations on sheet E-101.
a. There are three new lighting fixture type ‘A’, calculations show only 2.
b. Lighting fixture type ‘D’ is an outdoor fixture due to being in an open sided shade structure. This fixture/s must be included in the outdoor lighting calculations. The current fixture schedule shows type ‘D’ as unshielded and will need to be counted as such in the calculations or be replaced with a fully shielded fixture to be exempted.
2. Show the under canopy light type ‘D’ with a maximum color temperature of 3500K. Please note on the plans that the lighting fixtures shall be full-cutoff, with a maximum color temperature of 3500K, OLC 402.1.
06/08/2026 Fire New Construction Standard REVIEW COMPLETED
05/21/2026 PDSD Application Completeness Express REVIEW COMPLETED