Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0525-01076
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/24/2025 | Site Zoning Standard | APPROVED | |||
| 06/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/24/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please revise the occupancy group classification to be R-4 Condition 2 as this includes buildings in which there are any people receiving custodial care who require limited verbal or physical assistance while responding to an emergency situation to complete building evacuation. This comment was added because the plans indicate there are 2 R-4 Condition 2 residents. IBC 310.5.2 A. Related to the above comment; In Group R-4, Condition 2, at least two of the sleeping units shall be an Accessible unit. IBC 1107.6.4.1 ❖ The requirement for one sleeping unit and its associated facilities (e.g., bathrooms) to meet Accessible unit criteria is consistent with Group I-1, Condition 1 requirements. The requirement for two units is consistent with Group I-2, Condition 2 requirements. All common rooms are required to be fully accessible (see Section 1107.3). Section 1002 of ICC A117.1 provides the technical criteria for Accessible sleeping units. B. The bathrooms are required to be fully accessible. IBC 1107.3 3. Please amend plans to show how the accessibility elements have been upgraded. IEBC 305.7 requires that accessibility be provided to the altered spaces. Where the existing path of travel elements, which entails a primary entrance, sanitary facilities serving the area, and signs. If these items are not fully compliant, upgrades shall be required in accordance with IEBC.305.7. A. If the cost of providing or upgrading the items above to be accessible is disproportionate to the cost of construction (exceeds 20% of the cost of construction not including accessibility upgrades), please provide information to verify construction costs. If this exemption is taken, accessibility upgrades equaling 20% of the cost of the project shall be made. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 06/20/2025 | Fire New Construction Standard | REQUIRES RESUBMIT | Please note on the coversheet that a separate submittal is required for fire sprinkler system upgrades to accommodate an R4 Condition 2 occupancy in accordance with IFC 2024, 903.3.1.2. Questions: patricia.shelton@tucsonaz.gov |
||
| 06/02/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |