Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0525-01039
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/12/2025 | Commercial Mechanical Standard | NOT REQUIRED | Modular building | ||
| 06/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/13/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1 Please amend the plans to show the governing codes as 2018 International Building Code (IBC) 2009 ICC A117.1 Accessibility Code (by reference) 2018 International Mechanical Code (IMC) 2018 International Plumbing Code (IPC) 2017 National Electrical Code (NEC) 2024 International Fire Code (IFC) 2018 International Fuel Gas (IFGC) 2018 International Energy Conservation Code (IECC) City of Tucson/Pima County Outdoor Lighting Code Local Amendments to Above Codes ( www.tucsonaz.gov/pdsd/building-codes ) 2. Provide a complete set of plans, stamped as approved by the Arizona Department of Housing and please provide a copy of the ADOH installation permit. IBC 107.2.1 3. Please provide an architectural site plan with the following information on the Site Plan. IBC 107.2.1 A. Accessibility compliance for exterior routes, to and including door thresholds, B. Type and size of all underground utility lines. For example, water, gas, electrical, sewer, etc. C. Fire hydrant location, D. Water meter size and backflow prevention device requirements, E. Electrical service, F. Distance to property line or other buildings. G. Outdoor Lighting Code compliance. 4. Please provide the following information in the Building Information Block: A. Occupancy: For example, B B. Use: For example, Restaurant C. Construction type: For example, VB D. Square Footage: E. Sprinklers: Yes No F. Rating requirements for exterior walls and openings based on distance from property line, both real and imaginary. 5. Please amend plans to show the On-Site Utilities to FBBs on the plans: A. Show electrical source. i) Electrical source a) Provide one line drawing for new S.E.S. b) Provide a panel schedule with total load calculations. B. Provide Pima County Wastewater receipt with next submittal. IBC107.2.1 Provide water/sewer information. i) Direct connection of FBB to City Service. a) Detail size and location of domestic and / or landscape water meter(s). b) Detail point of connection to City water/sewer or landscape water service(s). c) Grease interceptor, size and location. (Requires approval from Industrial Waste Commission and will be included with the Pima County Wastewater receipt) ii) Connection of FBB to existing private water/sewer service. a) Detail location of existing services(s) and new point of connection. b) Provide water calculations to verify existing supply piping and meter capacity. iii) Include existing and new water supply fixture units, developed length of piping. iv) Detail existing and new drainage fixture units and verify existing sewer capacity. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 06/02/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0525-01039 (2952 E SPEEDWAY BL TUCSON, AZ 85716) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. The City of Tucson has currently adopted the 2017 National Electrical Code. Provide compliance with the adopted codes and show the correct code reference on the provided plans. REF sheet E1-1, Electrical General Notes, B for an example of the incorrect code reference. REF sheet G0-0, Code Analysis. 2. Provide Fault Current Analysis and show new equipment AIC rating sufficient to withstand the calculated Fault Current. Provide Available Fault Current calculations from TEP transformers to all new equipment, 2017 NEC 110.24. 3. Show new Panel’s and other new equipment with AIC ratings greater than or equal to the Available Fault Currents calculated, 2017 NEC 110.10. 4. Provide electrical load calculations, for the Main Services, Per NEC 220.40. 5. Provide complete compliance with the 2018 IECC for the interior lighting including sensors and lighting controls as required. (Typically, COMcheck). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 06/12/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide the civil site plan referenced on sheet P1.0 showing the route of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2018. 2. Specify the material of construction for the building sewer. Reference: Section 702.3, IPC 2018. 3. Show the location of all cleanouts for the building sewer. Provide a cleanout in the building sewer prior to entering the right-of-way. Reference: Pima County Standard Detail RWRD 401, 2021 and Section 703.5, IPC 2018. 4. Provide sizing calculations and specifications for the proposed grease interceptor. Reference: Section 1003.3, IPC 2018, as amended by the City of Tucson. 5. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Reference: Section 1003.3, IPC 2018, as amended by the City of Tucson. 6. A separate submittal to PC Industrial Wastewater Control is required to verify that the public sewer will be protected from harmful discharges. Contact Adam.DeLaTorre@pima.gov for review and assessment. Reference: Section 1003.1, IPC 2018 |
||
| 06/02/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Outdoor Lighting Review TC-COM-0525-01039 (2952 E SPEEDWAY BL TUCSON, AZ 85716) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. >>> MEP sheets are Sealed by a registrant in Texas. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Provide an outdoor lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. 3. List the Lighting Area per OLC chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 4. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. Show lamps with a maximum of 3500K color temperature, OLC 402.1. 5. Fixtures installed under canopies and overhangs. Outdoor lighting fixtures shall not be counted in determining the total light output when they are full cutoff light fixtures installed under canopies, building overhangs, or roof eaves, OLC 401.2.1(3). 6. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf 7. Specify any exceptions used. 8. Provide Curfew lighting controls If applicable Per section 403 and Table 601.3. 9. REF sheet MEP2.0, Light Pole Schedule is not readable. Please provide sheets that are not blurry. 10. Note on the plans that all signs and displays require a separate permit. All signs, including drive-through displays, shall meet the requirements of OLC chapter 5. As per the City of Tucson Outdoor Lighting Code the digital menu as shown on sheet A4.01 shall automatically dims to 200 NITS or less from sunset to sunrise. OLC 501.5 Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 06/20/2025 | Site Engineering Standard | REQUIRES RESUBMIT | TC-COM-0525-01039 2952 E SPEEDWAY BL Comments: - As Development Package (DP) TD-DEV-0525-00145 has not completed its first review site engineering cannot review the plans for compliance. Site Engineering will review the building plans for compliance with the DP once the DP has completed its review. Marco.contreras@tucsonaz.gov |
||
| 06/17/2025 | Site Zoning Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TTC-COM-0525-01039 - TD-DEV-0525-00145 2952 E SPEEDWAY BL. - C-1 Food Service (1st Review) TRANSMITTAL DATE: June 17, 2025 Provide a detailed response letter with your next submittal that clearly shows how you have addressed all Zoning comments. This site is located in the C-1 zone (UDC 4.7.20). Food Service is a permitted use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.4.M.1 & 5 and 4.9.13.O. 1. As Development Package (DP) TD-DEV-0525-00145 has not completed it’s first review Zoning cannot review the plans for compliance. Zoning will review the building plans for compliance with the DP once the DP has completed its first review. Until the DP is approved by all review agencies Zoning cannot approve this DP. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 06/12/2025 | Water - PDSD Standard | REQUIRES RESUBMIT | 1. Reduced pressure backflow prevention assemblies are required to be installed directly after the water meter for buildings that have food service facilities. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf. 2. Show the location and size of the proposed water meter, backflow preventer, and the water service pipe on a site plan. The development package is not a substitute for a complete site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018. 3. The installation of the reduced pressure assembly shall be, “…outside, above ground, as close as possible to the water meter or service connection as possible and on private property...” (see Tucson Water Standard Detail SD-1802). 4. Provide the expected water demand that the water meter will serve. Reference: Section 107.2.1, IBC 2018. |
||
| 06/04/2025 | Fire New Construction Standard | REVIEW COMPLETED | 1. Kitchen Fire Suppression system requires a separate submittal and Permit. 2. CO2 systems requires a separate operational permit from TFD 3. Applicable Fire Code is the 2024 IFC with local amendments. |
||
| 05/22/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |