Permit Number: TC-COM-0525-01035
Parcel: 13811073C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.5

Permit Number - TC-COM-0525-01035
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/06/2026 Outdoor Lighting Standard APPROVED
08/14/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/14/2026 Commercial Building Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0525-01035
ADDRESS/PARCEL: (6444 S FONTANA AV TUCSON, AZ 85706)
TC-COM-0526-00787 (3002 E GRANT RD Unit:UNIT 2 TUCSON, AZ 85716)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed.

Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976.

COMMENTS:
All previous versions of comments were not followed. Please allow me to paraphrase the requirements.
1. SPECIAL INSPECTION
a. Thank You for submitting the Special Inspection Form for the Modula Storage Units.
b. However, your response to the comments confirming Special Inspection needed for the Outdoor Lighting is missing. Please submit the filled SI form for review and approval.
2. SOLAR DRAWINGS/PLANS
a. Per previous comment, all solar information, drawings and plans are to be removed from this submission for the Modular Storage Units.
b. There need to have differences on drawings submittal for the Modular Storage Units Permit versus the Solar Photovoltaic System Permit. The same exact set of submittals were submitted for both the Storage Units and the Solar System.
c. The above was not followed.
d. Please follow this requirement.
3. SEPARATE 13 PERMITS
a. Please apply for separate permits for each separate grouping of Storage Units.
b. Each grouping shall follow the Grouping Letters already present on the drawings.
c. This permit TC-COM-0626-00793 shall be designated as Storage Units – A. The rest of the permits will be given each a letter, continuing with Storage Units – B all the way to Storage Units – M.
d. This will follow established City Standard permit organization. This will allow organized inspections for each Storage Units Groupings and will reduce confusions when the City Inspectors conducts the inspections.
e. Should you follow the above suggestion, the City of Tucson is willing to create the 12 other permits for you. All that is required is for the drawings to be organized as indicated above.
4. Once again, please submit every drawing/documents that pertains to this Modular Storage Units in order to be able to conduct a complete review.
5. Please obtain Building Address letters from Pima Addressing Department to be used for the 13 permits.
6. Please review the stated project valuation of $0.00 in your application. Based on the adopted fee schedule, the project square footage, the value derived from the default calculation will be much higher than what was specified on the permit application.
a. Please provide a copy of the construction contract or detailed estimates to verify the project valuation.
b. If additional information is not provided, the permit fees will be assessed based on the calculated valuation in accordance with IBC 109.3 and the adopted fee schedule. This may result in a higher review fee.
7. Please resubmit.
08/06/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0525-01035 (6444 S FONTANA AV TUCSON, AZ 85706)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Provide a Grounding Electrode System at the detached structure per 250.31(A). Grounding electrode system and grounding electrode conductor. Required.
2. Provide appropriate grounding and bonding of all metal structures, per all relevant sections of NEC 250 (example sections 250.4(A), 250.20, 250,32, 250.104).
3. Provide grounding/bonding of the Generac Generator per manufacturer’s requirements and NEC 250.

250.31(A) Grounding electrode system and grounding electrode conductor. Required.
250.31(B) equipment grounding conductor, grounding bonding equipment and structural metal. Sized accordance with 250.122.
08/11/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0525-01035
ADDRESS/PARCEL: 6444 S FONTANA AV TUCSON, AZ 85706

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov.

COMMENTS:

1. Please provide a complete propane fuel system layout on the plans. Show the locations of the propane tanks and gas piping on the site plan, including the piping route, pipe sizes, and pipe material. Provide the total gas load for the system and identify the locations of all propane shutoff valves and regulators. Provide dimensions verifying the minimum separation distances for the propane tanks. Reference: Section 402.2, IFGC 2024 & Section 6104.3, IFC 2024.
08/04/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TC-COM-0525-01035 (3rd Review)
Project: The proposed development consists of hybrid self-storage facility with 308 modular storage units placed above grade. Site improvements will include grading and access drives.
Location: 6444 S FONTANA AV
Review Date: 8/4/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Reviewer Contact: Marco.contreras@tucsonaz.gov
Related cases:

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering.
To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files.
Site Engineering Review Comments:
1. Building plans, including the site design, must match what was approved in Development Package (Site Plan) TD-DEV-0525-00143. On review of sheets 5–7, the site plan referenced in the electrical plans does not match the approved site design. Revise the plans to carry the same dimensions shown in the approved plans. Alternatively, the approved site plan sheet may be incorporated directly into the building plan set rather than creating a separate, non-approved site plan. The response regarding site zoning is acknowledged; however, this does not resolve the discrepancy, particularly since the plans are explicitly marked "For Construction."
08/04/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Bobby Parsons
Zoning Section Review

PROJECT:
TC-COM-0525-01035 - TD-DEV-0525-00143
6444 S. Fontana Ave. Tucson, AZ 85706
Hybrid Self Storage Facility (2nd Review)

TRANSMITTAL DATE: 8/4/2026

The site is located in C-2 zone (UDC 4.7.21).

Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed.

1. Comment: Follow up to previous comment 2: Building plans including the site plan must match what was approved in the associated Development Package (TD-DEV-0525-00143). Sheets 4-10 on the building plans marked “Issued For Construction” have PAAL widths that are smaller than what was approved in the associated Development Package. Per UDC Table 7.4.6-2, PAAL’s within a storage use development must be a minimum of 30’.
2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
07/22/2026 PDSD Application Completeness Express REVIEW COMPLETED